Tilenga Oil Field

From A Barrel Full
Revision as of 09:32, 28 June 2023 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Operator: Total Energies
  • Country: Uganda
  • Location: Lake Albert
  • Production start: 2025 (Scheduled)
  • Partners: CNOOC, UNOC
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2.
  • It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids
  • The field is to be developed together with the Kingfisher Oil Field
  • Oil is to be transported via the East African Crude Oil Pipeline (EACOP)

Contractors

  • -

History

  • 2016 - Development and production licenses were issued by the government
  • 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance

Geology

Links

  1. Uganda National Oil Company
  2. Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project