Tilenga Oil Field
Revision as of 09:32, 28 June 2023 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Total Energies
- Country: Uganda
- Location: Lake Albert
- Production start: 2025 (Scheduled)
- Partners: CNOOC, UNOC
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2.
- It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids
- The field is to be developed together with the Kingfisher Oil Field
- Oil is to be transported via the East African Crude Oil Pipeline (EACOP)
Contractors
- -
History
- 2016 - Development and production licenses were issued by the government
- 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance