East African Crude Oil Pipeline (EACOP)

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Uganda
  • Destination: Tanzania
  • Ownership: EACOP
  • Website: https://eacop.com/
  • Length: 1,443 kilometres ( miles)
  • Capacity: barrels of oil per day
  • Crude Type:

Brief Description

  • EACOP is a 1,443km crude oil export pipeline system that will transport Uganda’s crude oil from Kabaale – Hoima in Uganda to a maritime port facility on the Chongoleani peninsula near Tanga in Tanzania. This export system, (296km in Uganda and 1,147km in Tanzania), comprises a 24inch insulated buried pipeline, 6 Pumping stations (2 in Uganda and 4 in Tanzania), and a marine export terminal.
  • It will transport the oil from the Kingfisher Oil Field and the Tilenga Oil Field

Contractors

  • Worley: Engineering, Procurement, and Construction Management (EPCM)
  • China Petroleum Pipeline Engineering Company: Contruction of pipeline
  • Daqing Oilfield Construction Group Company Ltd (DOCG): design and construction of the terminal and the storage tanks at Tanga

Pipeline Status

  • Under construction

History

  • 2017 - Uganda and Tanzania sign intergovernmental agreement
  • 2021 - Final agreement signed between Uganda and Tanzania
  • 2023 - EACOP Ltd was granted a licence to construct the pipeline in Uganda

Other Information

  • -

Links

  1. Petroleum Authority of Uganda (PAU)
  2. Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project