Difference between revisions of "Tilenga Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 7: | Line 7: | ||
* Type: Oil & Gas | * Type: Oil & Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
− | * Production Volume: | + | * Production Volume: 200,000 (expected) |
=== Description === | === Description === | ||
Line 16: | Line 16: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * McDermott and Sinopec: engineering, procurement, construction and commissioning (EPCC) services |
+ | * Schlumberger: Directional drilling services, upper completions, lower completions, artificial lift solutions, and wellheads | ||
=== History === | === History === | ||
Line 22: | Line 23: | ||
* 2016 - Development and production licenses were issued by the government | * 2016 - Development and production licenses were issued by the government | ||
* 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance | * 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance | ||
+ | * 2021 - McDermott and Sinopec engineering awarded EPCC contract | ||
+ | * 2022 - Schlumberger Awarded drilling Contract | ||
=== Geology === | === Geology === | ||
Line 29: | Line 32: | ||
# [https://www.unoc.co.ug/upstream/ Uganda National Oil Company] | # [https://www.unoc.co.ug/upstream/ Uganda National Oil Company] | ||
# [https://a-barrel-full.blogspot.com/2021/04/uganda-and-tanzania-final-agreements.html Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project] | # [https://a-barrel-full.blogspot.com/2021/04/uganda-and-tanzania-final-agreements.html Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project] | ||
+ | # [https://abarrelfull.blogspot.com/2023/06/mcdermott-receives-conditional-letter.html McDermott receives Conditional Letter of Award for EPCC Contract of Tilenga Project] | ||
+ | # [https://abarrelfull.blogspot.com/2023/06/schlumberger-awarded-extensive-service.html Schlumberger Awarded Extensive Service Contract for Tilenga Onshore Oil Development in Uganda by TotalEnergies] | ||
[[category:Field]] | [[category:Field]] |
Latest revision as of 09:51, 28 June 2023
Summary Information
- Operator: Total Energies
- Country: Uganda
- Location: Lake Albert
- Production start: 2025 (Scheduled)
- Partners: CNOOC, UNOC
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume: 200,000 (expected)
Description
- The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2.
- It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids
- The field is to be developed together with the Kingfisher Oil Field
- Oil is to be transported via the East African Crude Oil Pipeline (EACOP)
Contractors
- McDermott and Sinopec: engineering, procurement, construction and commissioning (EPCC) services
- Schlumberger: Directional drilling services, upper completions, lower completions, artificial lift solutions, and wellheads
History
- 2016 - Development and production licenses were issued by the government
- 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance
- 2021 - McDermott and Sinopec engineering awarded EPCC contract
- 2022 - Schlumberger Awarded drilling Contract
Geology
Links
- Uganda National Oil Company
- Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project
- McDermott receives Conditional Letter of Award for EPCC Contract of Tilenga Project
- Schlumberger Awarded Extensive Service Contract for Tilenga Onshore Oil Development in Uganda by TotalEnergies