Difference between revisions of "Tilenga Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Total Energies |
− | * Country: | + | * Country: Uganda |
− | * Location: | + | * Location: Lake Albert |
− | * Production start: | + | * Production start: 2025 (Scheduled) |
− | * Partners: | + | * Partners: CNOOC, UNOC |
− | * Type: Oil | + | * Type: Oil & Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
Line 11: | Line 11: | ||
=== Description === | === Description === | ||
* The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2. | * The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2. | ||
+ | * It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids | ||
* The field is to be developed together with the [[Kingfisher Oil Field]] | * The field is to be developed together with the [[Kingfisher Oil Field]] | ||
* Oil is to be transported via the [[East African Crude Oil Pipeline (EACOP)]] | * Oil is to be transported via the [[East African Crude Oil Pipeline (EACOP)]] | ||
Line 18: | Line 19: | ||
=== History === | === History === | ||
− | + | ||
* 2016 - Development and production licenses were issued by the government | * 2016 - Development and production licenses were issued by the government | ||
+ | * 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance | ||
=== Geology === | === Geology === | ||
Line 26: | Line 28: | ||
=== Links === | === Links === | ||
# [https://www.unoc.co.ug/upstream/ Uganda National Oil Company] | # [https://www.unoc.co.ug/upstream/ Uganda National Oil Company] | ||
+ | # [https://a-barrel-full.blogspot.com/2021/04/uganda-and-tanzania-final-agreements.html Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Uganda]] | ||
+ | [[category:Total]] | ||
+ | [[category:CNOOC]] |
Revision as of 09:32, 28 June 2023
Summary Information
- Operator: Total Energies
- Country: Uganda
- Location: Lake Albert
- Production start: 2025 (Scheduled)
- Partners: CNOOC, UNOC
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2.
- It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids
- The field is to be developed together with the Kingfisher Oil Field
- Oil is to be transported via the East African Crude Oil Pipeline (EACOP)
Contractors
- -
History
- 2016 - Development and production licenses were issued by the government
- 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance