=== Summary Information ===
 
=== Summary Information ===
* Operator:  
+
* Operator: Total Energies
* Country:  
+
* Country: Uganda
* Location:  
+
* Location: Lake Albert
* Production start:  
+
* Production start: 2025 (Scheduled)
* Partners:  
+
* Partners: CNOOC, UNOC
* Type: Oil / Gas
+
* Type: Oil & Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume:  
 
* Production Volume:  
Line 11: Line 11:
 
=== Description ===
 
=== Description ===
 
* The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2.
 
* The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2.
 +
* It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids
 
* The field is to be developed together with the [[Kingfisher Oil Field]]
 
* The field is to be developed together with the [[Kingfisher Oil Field]]
 
* Oil is to be transported via the [[East African Crude Oil Pipeline (EACOP)]]
 
* Oil is to be transported via the [[East African Crude Oil Pipeline (EACOP)]]
Line 18: Line 19:
  
 
=== History ===
 
=== History ===
*
+
 
 
* 2016 - Development and production licenses were issued by the government
 
* 2016 - Development and production licenses were issued by the government
 +
* 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance
  
 
=== Geology ===
 
=== Geology ===
Line 26: Line 28:
 
=== Links ===
 
=== Links ===
 
# [https://www.unoc.co.ug/upstream/ Uganda National Oil Company]
 
# [https://www.unoc.co.ug/upstream/ Uganda National Oil Company]
 +
# [https://a-barrel-full.blogspot.com/2021/04/uganda-and-tanzania-final-agreements.html Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project]
 +
 +
[[category:Field]]
 +
[[category:Uganda]]
 +
[[category:Total]]
 +
[[category:CNOOC]]

Revision as of 09:32, 28 June 2023

Summary Information

  • Operator: Total Energies
  • Country: Uganda
  • Location: Lake Albert
  • Production start: 2025 (Scheduled)
  • Partners: CNOOC, UNOC
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Tilenga Project is located in the north of Lake Albert and constitutes License Areas (LA) 1 and 2.
  • It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids
  • The field is to be developed together with the Kingfisher Oil Field
  • Oil is to be transported via the East African Crude Oil Pipeline (EACOP)

Contractors

  • -

History

  • 2016 - Development and production licenses were issued by the government
  • 2021 - Final agreement signed between Uganda and Tanzania on the pipeline, enabling project to advance

Geology

Links

  1. Uganda National Oil Company
  2. Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project