Difference between revisions of "Stade LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
=== History === | === History === | ||
− | * | + | * 2022 - EnBW signs purchase contract |
=== Other Information === | === Other Information === |
Revision as of 13:24, 31 March 2022
Contents
Summary Information
- Ownership: Hanseatic Energy Hub
- Website: https://www.hanseatic-energy-hub.de/en/
- Location: Stade, on the River Elbe, with access to the North Sea and the Port of Hamburg, Germany
- Capacity: 9.0 million tons/annum
- Status: Planned
Brief Description
- The Stade LNG Terminal is an onshore project in Northern Germany with planned regasification capacity is 12 billion m³/a and a feed-in capacity of 21.7 GW.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers: EnBW intends to purchase at least three billion cubic meters of natural gas per annum
History
- 2022 - EnBW signs purchase contract
Other Information
-