Stade LNG Terminal
Jump to navigation
Jump to search
Contents
Summary Information
- Ownership: Hanseatic Energy Hub
- Website: https://www.hanseatic-energy-hub.de/en/
- Location: Stade, on the River Elbe, with access to the North Sea and the Port of Hamburg, Germany
- Capacity: 9.0 million tons/annum
- Status: Planned
Brief Description
- The Stade LNG Terminal is an onshore project in Northern Germany with planned regasification capacity is 12 billion m³/a and a feed-in capacity of 21.7 GW.
- The terminal will utilize Dow’s industrial waste heat to regasify the LNG
Technical Details
- Storage capacity: two storage tanks, each with a capacity of 240,000 cubic metres
- Unloading capacity:
- Send out capacity:
- Constructor:
- Técnicas Reunidas, FCC and Entrade: EPC (Engineering, Procurement and Construction)
Ongoing Projects/Project Status
- Engineering
- Completion expected in 2027
Suppliers / Customers
- Suppliers:
- Customers: EnBW intends to purchase at least three billion cubic meters of natural gas per annum
History
- 2022 - EnBW signs purchase contract
- 2023 - EPC contract awarded
Other Information
-