Difference between revisions of "Stade LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
=== Brief Description ===
 
=== Brief Description ===
 
* The Stade LNG Terminal is an onshore project in Northern Germany with planned regasification capacity is 12 billion m³/a and a feed-in capacity of 21.7 GW.
 
* The Stade LNG Terminal is an onshore project in Northern Germany with planned regasification capacity is 12 billion m³/a and a feed-in capacity of 21.7 GW.
 +
* The terminal will utilize Dow’s industrial waste heat to regasify the LNG
  
 
=== Technical Details ===
 
=== Technical Details ===
  
* Storage capacity:  
+
* Storage capacity: two storage tanks, each with a capacity of 240,000 cubic metres
 
* Unloading capacity:
 
* Unloading capacity:
 
* Send out capacity:
 
* Send out capacity:
 
* Constructor:
 
* Constructor:
 +
** Técnicas Reunidas, FCC and Entrade: EPC (Engineering, Procurement and Construction)
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
 
+
* Engineering
 +
* Completion expected in 2027
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
  
 
* Suppliers:
 
* Suppliers:
* Customers:
+
* Customers: EnBW intends to purchase at least three billion cubic meters of natural gas per annum
  
 
=== History ===
 
=== History ===
  
* 200X -  
+
* 2022 - EnBW signs purchase contract
 +
* 2023 - EPC contract awarded
  
 
=== Other Information ===
 
=== Other Information ===
Line 34: Line 38:
 
=== Links ===
 
=== Links ===
 
# [https://lng-news.blogspot.com/2022/03/enbw-stepping-up-activities-in-field-of.html EnBW stepping up activities in the field of liquefied natural gas and starting partnership with Hanseatic Energy Hub in Stade]
 
# [https://lng-news.blogspot.com/2022/03/enbw-stepping-up-activities-in-field-of.html EnBW stepping up activities in the field of liquefied natural gas and starting partnership with Hanseatic Energy Hub in Stade]
 +
# [https://lng-news.blogspot.com/2023/04/tecnicas-reunidas-and-fcc-in-consortium.html Técnicas Reunidas and FCC in consortium with Entrade GMBH win the contract to develop a large regasification terminal in Germany]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Germany]]
 
[[category:Germany]]

Latest revision as of 11:15, 19 April 2023

Summary Information

  • Ownership: Hanseatic Energy Hub
  • Website: https://www.hanseatic-energy-hub.de/en/
  • Location: Stade, on the River Elbe, with access to the North Sea and the Port of Hamburg, Germany
  • Capacity: 9.0 million tons/annum
  • Status: Planned

Brief Description

  • The Stade LNG Terminal is an onshore project in Northern Germany with planned regasification capacity is 12 billion m³/a and a feed-in capacity of 21.7 GW.
  • The terminal will utilize Dow’s industrial waste heat to regasify the LNG

Technical Details

  • Storage capacity: two storage tanks, each with a capacity of 240,000 cubic metres
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • Técnicas Reunidas, FCC and Entrade: EPC (Engineering, Procurement and Construction)

Ongoing Projects/Project Status

  • Engineering
  • Completion expected in 2027

Suppliers / Customers

  • Suppliers:
  • Customers: EnBW intends to purchase at least three billion cubic meters of natural gas per annum

History

  • 2022 - EnBW signs purchase contract
  • 2023 - EPC contract awarded

Other Information

-

Links

  1. EnBW stepping up activities in the field of liquefied natural gas and starting partnership with Hanseatic Energy Hub in Stade
  2. Técnicas Reunidas and FCC in consortium with Entrade GMBH win the contract to develop a large regasification terminal in Germany