* The Stade LNG Terminal is an onshore project in Northern Germany with planned regasification capacity is 12 billion m³/a and a feed-in capacity of 21.7 GW. | * The Stade LNG Terminal is an onshore project in Northern Germany with planned regasification capacity is 12 billion m³/a and a feed-in capacity of 21.7 GW. | ||
+ | * The terminal will utilize Dow’s industrial waste heat to regasify the LNG | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: two storage tanks, each with a capacity of 240,000 cubic metres |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
+ | ** Técnicas Reunidas, FCC and Entrade: EPC (Engineering, Procurement and Construction) | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | + | * Engineering | |
+ | * Completion expected in 2027 | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: | * Suppliers: | ||
− | * Customers: | + | * Customers: EnBW intends to purchase at least three billion cubic meters of natural gas per annum |
=== History === | === History === | ||
− | * | + | * 2022 - EnBW signs purchase contract |
+ | * 2023 - EPC contract awarded | ||
=== Other Information === | === Other Information === | ||
Line 34: | Line 38: | ||
=== Links === | === Links === | ||
# [https://lng-news.blogspot.com/2022/03/enbw-stepping-up-activities-in-field-of.html EnBW stepping up activities in the field of liquefied natural gas and starting partnership with Hanseatic Energy Hub in Stade] | # [https://lng-news.blogspot.com/2022/03/enbw-stepping-up-activities-in-field-of.html EnBW stepping up activities in the field of liquefied natural gas and starting partnership with Hanseatic Energy Hub in Stade] | ||
+ | # [https://lng-news.blogspot.com/2023/04/tecnicas-reunidas-and-fcc-in-consortium.html Técnicas Reunidas and FCC in consortium with Entrade GMBH win the contract to develop a large regasification terminal in Germany] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Germany]] | [[category:Germany]] |
Latest revision as of 11:15, 19 April 2023
Contents
Summary Information
- Ownership: Hanseatic Energy Hub
- Website: https://www.hanseatic-energy-hub.de/en/
- Location: Stade, on the River Elbe, with access to the North Sea and the Port of Hamburg, Germany
- Capacity: 9.0 million tons/annum
- Status: Planned
Brief Description
- The Stade LNG Terminal is an onshore project in Northern Germany with planned regasification capacity is 12 billion m³/a and a feed-in capacity of 21.7 GW.
- The terminal will utilize Dow’s industrial waste heat to regasify the LNG
Technical Details
- Storage capacity: two storage tanks, each with a capacity of 240,000 cubic metres
- Unloading capacity:
- Send out capacity:
- Constructor:
- Técnicas Reunidas, FCC and Entrade: EPC (Engineering, Procurement and Construction)
Ongoing Projects/Project Status
- Engineering
- Completion expected in 2027
Suppliers / Customers
- Suppliers:
- Customers: EnBW intends to purchase at least three billion cubic meters of natural gas per annum
History
- 2022 - EnBW signs purchase contract