Difference between revisions of "Satah Al-Razboot SARB Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 25: | Line 25: | ||
* 2013 - Petrofac awarded major subsea project | * 2013 - Petrofac awarded major subsea project | ||
* 2021 - Cepsa sold its stake to TotalEnergies | * 2021 - Cepsa sold its stake to TotalEnergies | ||
+ | * 2021 - ADNOC awarded drilling contracts to expand production | ||
=== Geology === | === Geology === | ||
Line 35: | Line 36: | ||
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development] | # [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development] | ||
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies] | # [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies] | ||
+ | # [https://abarrelfull.blogspot.com/2024/03/adnoc-invests-over-750-million-in.html ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:UAE]] | ||
+ | [[category:ADNOC]] |
Revision as of 13:31, 26 March 2024
Summary Information
- Operator: ADMA-OPCO
- Country: UAE
- Location: 120 kilometres to the northwest of Abu Dhabi
- Production start: 2016 - Expected
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day
- Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.
Contractors
- Fluor: Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
- Petrofac:
- 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.
- The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.
- The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
- JDR: design and manufacture of five subsea power and communication (composite) cables and associated accessories
History
- 2010 - Fluor Wins FEED Contract for full field development
- 2013 - Petrofac awarded major subsea project
- 2021 - Cepsa sold its stake to TotalEnergies
- 2021 - ADNOC awarded drilling contracts to expand production
Geology
Links
- Bluewater Calm Buoy Mooring References
- Fluor Wins Offshore FEED Contract in Abu Dhabi
- Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi
- Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development
- Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies
- ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth