Difference between revisions of "Nizhny Novgorod Refinery Coker Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Lukoil Website: http://www.lukoil.com/ List of Lukoil Refineries Wiki Page: Nizhny Novgorod Refinery Location: Nizhny Novgorod Capacity: 17.0 mi...") |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Lukoil | + | * Ownership: Lukoil |
− | Website: http://www.lukoil.com/ | + | * Website: http://www.lukoil.com/ |
− | List of Lukoil Refineries | + | * List of [[Lukoil Refineries]] |
− | Wiki Page: Nizhny Novgorod Refinery | + | * Wiki Page: [[Nizhny Novgorod Refinery]] |
− | Location: Nizhny Novgorod | + | * Location: Kstovo, Nizhny Novgorod |
− | Capacity: 17.0 million tons/annum & 340,000 bbl/day | + | * Capacity: 17.0 million tons/annum & 340,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Project Stage: | + | * Project Stage: Under construction |
− | Expected Completion: 2021 | + | * Expected Completion: 2021 |
− | Budget: | + | * Budget: |
− | The Project | + | |
− | Project Type: Upgrade | + | === The Project === |
− | Project Summary: Apart from a delayed coker, the complex, with the total annual feed rate of 2.1 million tons, features a diesel hydrotreater, a gas fractionator, hydrogen and sulfur production units, as well as infrastructure facilities. Once the new facility is commissioned, the Nizhny Novgorod refinery will significantly reduce its production of fuel oil, increase refinery yield up to 95.5% and achieve higher synergy with the fluidized catalytic-cracking units already in operation. As a result, the yield of light petroleum products will grow from the actual 64% up to 76%. | + | * Project Type: Upgrade |
− | Main Contractors | + | * Project Summary: Apart from a delayed coker, the complex, with the total annual feed rate of 2.1 million tons, features a diesel hydrotreater, a gas fractionator, hydrogen and sulfur production units, as well as infrastructure facilities. Once the new facility is commissioned, the Nizhny Novgorod refinery will significantly reduce its production of fuel oil, increase refinery yield up to 95.5% and achieve higher synergy with the fluidized catalytic-cracking units already in operation. As a result, the yield of light petroleum products will grow from the actual 64% up to 76%. |
− | CB&I: detailed engineering, procurement and supply of process equipment, including two proprietary delayed coking heaters | + | * Main Contractors |
− | Kinetics Technology: EPC contracts for the Diesel Fuel Hydrotreater Unit, a Hydrogen Production Unit, a Pressure Swing Adsorption (PSA) unit as well as a Gas Fractionation Unit and a Sulphur Recovery Unit. | + | ** CB&I: detailed engineering, procurement and supply of process equipment, including two proprietary delayed coking heaters |
− | Chevron Lummus Global's (CLG): Delayed coking technology | + | ** Kinetics Technology: EPC contracts for the Diesel Fuel Hydrotreater Unit, a Hydrogen Production Unit, a Pressure Swing Adsorption (PSA) unit as well as a Gas Fractionation Unit and a Sulphur Recovery Unit. |
− | Refining Units | + | ** Chevron Lummus Global's (CLG): Delayed coking technology |
− | Delayed coker | + | === Refining Units === |
− | Diesel hydrotreater, | + | * Delayed coker |
− | gas fractionator, | + | * Diesel hydrotreater, |
− | Hydrogen production unit | + | * gas fractionator, |
− | Sulphur production unit | + | * Hydrogen production unit |
− | Terminal Capacity | + | * Sulphur production unit |
− | Crude Oil: | + | |
− | Refined Products: | + | === Terminal Capacity === |
− | Crude Supply | + | * Crude Oil: |
+ | * Refined Products: | ||
+ | === Crude Supply === | ||
- | - | ||
− | Products Produced | + | === Products Produced === |
− | The construction of the complex and related operations optimization will improve the refinery's light product yield by more than 10% while reducing the fuel oil production by 2.7 million tonnes per annum | + | * The construction of the complex and related operations optimization will improve the refinery's light product yield by more than 10% while reducing the fuel oil production by 2.7 million tonnes per annum |
− | History | + | === History === |
− | 2017 - Final investment decision taken | + | * 2017 - Final investment decision taken |
− | 2017 - CB&I awarded EPC contract | + | * 2017 - CB&I awarded EPC contract |
− | 2018 - Construction started | + | * 2018 - Construction started |
− | Other Information | + | * 2022 - Project completed |
+ | |||
+ | === Other Information === | ||
- | - | ||
=== Links === | === Links === | ||
+ | # [[Kinetics Technology Refinery References]] | ||
# [http://killajoules.wikidot.com/archive:lukoil-takes-final-investment-decision-on-delayed-co Lukoil Takes Final Investment Decision On Delayed Coker At Nizhny Novgorod Refinery] | # [http://killajoules.wikidot.com/archive:lukoil-takes-final-investment-decision-on-delayed-co Lukoil Takes Final Investment Decision On Delayed Coker At Nizhny Novgorod Refinery] | ||
# [http://killajoules.wikidot.com/archive:cb-i-announces-engineering-procurement-and-supply-aw CB&I Announces Engineering, Procurement and Supply Award for LUKOIL] | # [http://killajoules.wikidot.com/archive:cb-i-announces-engineering-procurement-and-supply-aw CB&I Announces Engineering, Procurement and Supply Award for LUKOIL] | ||
# [http://killajoules.wikidot.com/archive:lukoil-starts-construction-of-petroleum-residue-recy/ Lukoil Starts Construction Of Petroleum Residue Recycling Facility At Nizhny Novgorod Refinery] | # [http://killajoules.wikidot.com/archive:lukoil-starts-construction-of-petroleum-residue-recy/ Lukoil Starts Construction Of Petroleum Residue Recycling Facility At Nizhny Novgorod Refinery] | ||
# [http://killajoules.wikidot.com/archive:two-epc-contracts-worth-usd-527-mn-awarded-by-lukoil Two EPC contracts worth USD 527 MN awarded by Lukoil in the refining business] | # [http://killajoules.wikidot.com/archive:two-epc-contracts-worth-usd-527-mn-awarded-by-lukoil Two EPC contracts worth USD 527 MN awarded by Lukoil in the refining business] | ||
+ | # [http://killajoules.wikidot.com/archive:mcdermott-awarded-epc-contract-for-delayed-coker-uni McDermott Awarded EPC Contract for Delayed Coker Unit for LUKOIL Refinery] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/lukoil-commissions-petroleum-residue.html Lukoil Commissions Petroleum Residue Recycling Facility at Its Nizhny Novgorod Refinery] | ||
+ | |||
+ | [[category:Refinery]] | ||
+ | [[category:Russia]] | ||
+ | [[category:Lukoil]] |
Latest revision as of 15:15, 10 January 2023
Contents
Summary Information
- Ownership: Lukoil
- Website: http://www.lukoil.com/
- List of Lukoil Refineries
- Wiki Page: Nizhny Novgorod Refinery
- Location: Kstovo, Nizhny Novgorod
- Capacity: 17.0 million tons/annum & 340,000 bbl/day
- Nelson Complexity:
- Project Stage: Under construction
- Expected Completion: 2021
- Budget:
The Project
- Project Type: Upgrade
- Project Summary: Apart from a delayed coker, the complex, with the total annual feed rate of 2.1 million tons, features a diesel hydrotreater, a gas fractionator, hydrogen and sulfur production units, as well as infrastructure facilities. Once the new facility is commissioned, the Nizhny Novgorod refinery will significantly reduce its production of fuel oil, increase refinery yield up to 95.5% and achieve higher synergy with the fluidized catalytic-cracking units already in operation. As a result, the yield of light petroleum products will grow from the actual 64% up to 76%.
- Main Contractors
- CB&I: detailed engineering, procurement and supply of process equipment, including two proprietary delayed coking heaters
- Kinetics Technology: EPC contracts for the Diesel Fuel Hydrotreater Unit, a Hydrogen Production Unit, a Pressure Swing Adsorption (PSA) unit as well as a Gas Fractionation Unit and a Sulphur Recovery Unit.
- Chevron Lummus Global's (CLG): Delayed coking technology
Refining Units
- Delayed coker
- Diesel hydrotreater,
- gas fractionator,
- Hydrogen production unit
- Sulphur production unit
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- The construction of the complex and related operations optimization will improve the refinery's light product yield by more than 10% while reducing the fuel oil production by 2.7 million tonnes per annum
History
- 2017 - Final investment decision taken
- 2017 - CB&I awarded EPC contract
- 2018 - Construction started
- 2022 - Project completed
Other Information
-
Links
- Kinetics Technology Refinery References
- Lukoil Takes Final Investment Decision On Delayed Coker At Nizhny Novgorod Refinery
- CB&I Announces Engineering, Procurement and Supply Award for LUKOIL
- Lukoil Starts Construction Of Petroleum Residue Recycling Facility At Nizhny Novgorod Refinery
- Two EPC contracts worth USD 527 MN awarded by Lukoil in the refining business
- McDermott Awarded EPC Contract for Delayed Coker Unit for LUKOIL Refinery
- Lukoil Commissions Petroleum Residue Recycling Facility at Its Nizhny Novgorod Refinery