Summary Information
+
=== Summary Information ===
Ownership: Nippon Oil
+
 
Website: http://www.noe.jx-group.co.jp/english/
+
* Ownership: Nippon Oil
List of Nippon Oil Refineries
+
* Website: http://www.noe.jx-group.co.jp/english/
Location: Yokahama, Japan
+
** List of [[Nippon Oil Refineries]]
Capacity: 13.5 million tons/annum & 270,000 bbl/day
+
* Location: Yokahama, Japan
Nelson Complexity:
+
* Capacity: 13.5 million tons/annum & 270,000 bbl/day
Refining Depth:
+
* Nelson Complexity:  
Brief Description
+
* Refining Depth:
A large high complexity refinery
+
 
Refining Units
+
=== Brief Description ===
Atmospheric Distillation
+
* A large high complexity refinery
Vacuum Crude Oil Distillation - 130,000
+
 
Residue Fluid Catalytic Cracking (RFCC) unit 40,000 bpd
+
=== Refining Units ===
Catalytic Cracking - 83,000
+
 
Alkylation - 9.000
+
* Atmospheric Distillation
Catalytic Reforming - 50.000 + 14.000
+
* Vacuum Crude Oil Distillation - 130,000
Desulfurisation
+
* Residue Fluid Catalytic Cracking (RFCC) unit 40,000 bpd  
Naphtha - 71.500
+
* Catalytic Cracking - 83,000
FCC Gasoline - 28.000
+
* Alkylation - 9.000
Middle Distillate - 137.500
+
* Catalytic Reforming - 50.000 + 14.000  
Coker 20,000 bpd (idled)
+
* Desulfurisation
Terminal Capacity
+
** Naphtha - 71.500
Crude Oil:
+
** FCC Gasoline - 28.000
Refined Products:
+
** Middle Distillate - 137.500
Crude Supply
+
* Coker 20,000 bpd (idled)
-
+
 
Products Produced
+
=== Terminal Capacity ===
-
+
 
Ongoing Projects
+
* Crude Oil:  
The capacity of the refinery is being decreased with the closure of a 70,000 bpd distillation column in October 2010
+
* Refined Products:  
Other Information
+
 
-
+
=== Crude Supply ===
History
+
* -
1968 - Solvent Extraction Unit added
+
 
1983 - Visbreaker unit commissioned
+
=== Products Produced ===
1986 - Catalytic Reforming & Naphtha Desulphurisation Units started
+
* -
1993 - Residuum Hydrodesulfurization Unit & Sulphur units commissioned
+
 
2009 - Construction Completed for Japan’s first bio-ETBE Production Plant
+
=== Ongoing Projects ===
2010 - A 70,000 bpd distilation column was decommissioned
+
* The capacity of the refinery is being decreased with the closure of a 70,000 bpd distillation column in October 2010
Relevant Links
+
 
Chiyoda Visbreaking Units
+
=== Other Information ===
Chiyoda Catalytic Reforming Units
+
* -
Chiyoda Lubricating Oil Refining Units
+
 
Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
+
=== History ===
Chiyoda Residuum Hydrodesulfurization Units
+
* 1968 - Solvent Extraction Unit added
Chiyoda H2S Removal Units With Amine
+
* 1983 - Visbreaker unit commissioned
Chiyoda Sour Water Stripping Units
+
* 1986 - Catalytic Reforming & Naphtha Desulphurisation Units started
Chiyoda Claus Tail Gas Treating Units
+
* 1993 - Residuum Hydrodesulfurization Unit & Sulphur units commissioned
Japan's JX considers closing Negishi refinery
+
* 2009 - Construction Completed for Japan’s first bio-ETBE Production Plant
Japan's JX, Fuji Oil scrap CDUs
+
* 2010 - A 70,000 bpd distilation column was decommissioned
Construction Completed for Japan’s first bio-ETBE Production Plant at Negishi Refinery
+
 
 +
=== Relevant Links ===
 +
# [[Chiyoda Visbreaking Units]]
 +
# [[Chiyoda Catalytic Reforming Units]]
 +
# [[Chiyoda Lubricating Oil Refining Units]]
 +
# [[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]
 +
# [[Chiyoda Residuum Hydrodesulfurization Units]]
 +
# [[Chiyoda H2S Removal Units With Amine]]
 +
# [[Chiyoda Sour Water Stripping Units]]
 +
# [[Chiyoda Claus Tail Gas Treating Units]]
 +
# [http://af.reuters.com/article/energyOilNews/idAFTOE69505420101006 Japan's JX considers closing Negishi refinery]
 +
# [http://af.reuters.com/article/energyOilNews/idAFTOE6A004720101101 Japan's JX, Fuji Oil scrap CDUs]
 +
# [http://www.noe.jx-group.co.jp/english/press/noc/2009/e71_enpr_091026.html Construction Completed for Japan’s first bio-ETBE Production Plant at Negishi Refinery]

Revision as of 16:45, 25 January 2022

Summary Information

Brief Description

  • A large high complexity refinery

Refining Units

  • Atmospheric Distillation
  • Vacuum Crude Oil Distillation - 130,000
  • Residue Fluid Catalytic Cracking (RFCC) unit 40,000 bpd
  • Catalytic Cracking - 83,000
  • Alkylation - 9.000
  • Catalytic Reforming - 50.000 + 14.000
  • Desulfurisation
    • Naphtha - 71.500
    • FCC Gasoline - 28.000
    • Middle Distillate - 137.500
  • Coker 20,000 bpd (idled)

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -

Products Produced

  • -

Ongoing Projects

  • The capacity of the refinery is being decreased with the closure of a 70,000 bpd distillation column in October 2010

Other Information

  • -

History

  • 1968 - Solvent Extraction Unit added
  • 1983 - Visbreaker unit commissioned
  • 1986 - Catalytic Reforming & Naphtha Desulphurisation Units started
  • 1993 - Residuum Hydrodesulfurization Unit & Sulphur units commissioned
  • 2009 - Construction Completed for Japan’s first bio-ETBE Production Plant
  • 2010 - A 70,000 bpd distilation column was decommissioned

Relevant Links

  1. Chiyoda Visbreaking Units
  2. Chiyoda Catalytic Reforming Units
  3. Chiyoda Lubricating Oil Refining Units
  4. Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
  5. Chiyoda Residuum Hydrodesulfurization Units
  6. Chiyoda H2S Removal Units With Amine
  7. Chiyoda Sour Water Stripping Units
  8. Chiyoda Claus Tail Gas Treating Units
  9. Japan's JX considers closing Negishi refinery
  10. Japan's JX, Fuji Oil scrap CDUs
  11. Construction Completed for Japan’s first bio-ETBE Production Plant at Negishi Refinery