Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Nippon Oil Website: http://www.noe.jx-group.co.jp/english/ List of Nippon Oil Refineries Location: Yokahama, Japan Capacity: 13.5 million tons/a...") |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Nippon Oil | + | |
− | Website: http://www.noe.jx-group.co.jp/english/ | + | * Ownership: Nippon Oil |
− | List of Nippon Oil Refineries | + | * Website: http://www.noe.jx-group.co.jp/english/ |
− | Location: Yokahama, Japan | + | ** List of [[Nippon Oil Refineries]] |
− | Capacity: 13.5 million tons/annum & 270,000 bbl/day | + | * Location: Yokahama, Japan |
− | Nelson Complexity: | + | * Capacity: 13.5 million tons/annum & 270,000 bbl/day |
− | Refining Depth: | + | * Nelson Complexity: |
− | Brief Description | + | * Refining Depth: |
− | A large high complexity refinery | + | |
− | Refining Units | + | === Brief Description === |
− | Atmospheric Distillation | + | * A large high complexity refinery |
− | Vacuum Crude Oil Distillation - 130,000 | + | |
− | Residue Fluid Catalytic Cracking (RFCC) unit 40,000 bpd | + | === Refining Units === |
− | Catalytic Cracking - 83,000 | + | |
− | Alkylation - 9.000 | + | * Atmospheric Distillation |
− | Catalytic Reforming - 50.000 + 14.000 | + | * Vacuum Crude Oil Distillation - 130,000 |
− | Desulfurisation | + | * Residue Fluid Catalytic Cracking (RFCC) unit 40,000 bpd |
− | Naphtha - 71.500 | + | * Catalytic Cracking - 83,000 |
− | FCC Gasoline - 28.000 | + | * Alkylation - 9.000 |
− | Middle Distillate - 137.500 | + | * Catalytic Reforming - 50.000 + 14.000 |
− | Coker 20,000 bpd (idled) | + | * Desulfurisation |
− | Terminal Capacity | + | ** Naphtha - 71.500 |
− | Crude Oil: | + | ** FCC Gasoline - 28.000 |
− | Refined Products: | + | ** Middle Distillate - 137.500 |
− | Crude Supply | + | * Coker 20,000 bpd (idled) |
− | - | + | |
− | Products Produced | + | === Terminal Capacity === |
− | - | + | |
− | Ongoing Projects | + | * Crude Oil: |
− | The capacity of the refinery is being decreased with the closure of a 70,000 bpd distillation column in October 2010 | + | * Refined Products: |
− | Other Information | + | |
− | - | + | === Crude Supply === |
− | History | + | * - |
− | 1968 - Solvent Extraction Unit added | + | |
− | 1983 - Visbreaker unit commissioned | + | === Products Produced === |
− | 1986 - Catalytic Reforming & Naphtha Desulphurisation Units started | + | * - |
− | 1993 - Residuum Hydrodesulfurization Unit & Sulphur units commissioned | + | |
− | 2009 - Construction Completed for Japan’s first bio-ETBE Production Plant | + | === Ongoing Projects === |
− | 2010 - A 70,000 bpd distilation column was decommissioned | + | * The capacity of the refinery is being decreased with the closure of a 70,000 bpd distillation column in October 2010 |
− | Relevant Links | + | |
− | Chiyoda Visbreaking Units | + | === Other Information === |
− | Chiyoda Catalytic Reforming Units | + | * - |
− | Chiyoda Lubricating Oil Refining Units | + | |
− | Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U | + | === History === |
− | Chiyoda Residuum Hydrodesulfurization Units | + | * 1968 - Solvent Extraction Unit added |
− | Chiyoda H2S Removal Units With Amine | + | * 1983 - Visbreaker unit commissioned |
− | Chiyoda Sour Water Stripping Units | + | * 1986 - Catalytic Reforming & Naphtha Desulphurisation Units started |
− | Chiyoda Claus Tail Gas Treating Units | + | * 1993 - Residuum Hydrodesulfurization Unit & Sulphur units commissioned |
− | Japan's JX considers closing Negishi refinery | + | * 2009 - Construction Completed for Japan’s first bio-ETBE Production Plant |
− | Japan's JX, Fuji Oil scrap CDUs | + | * 2010 - A 70,000 bpd distilation column was decommissioned |
− | Construction Completed for Japan’s first bio-ETBE Production Plant at Negishi Refinery | + | |
+ | === Relevant Links === | ||
+ | # [[Chiyoda Visbreaking Units]] | ||
+ | # [[Chiyoda Catalytic Reforming Units]] | ||
+ | # [[Chiyoda Lubricating Oil Refining Units]] | ||
+ | # [[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]] | ||
+ | # [[Chiyoda Residuum Hydrodesulfurization Units]] | ||
+ | # [[Chiyoda H2S Removal Units With Amine]] | ||
+ | # [[Chiyoda Sour Water Stripping Units]] | ||
+ | # [[Chiyoda Claus Tail Gas Treating Units]] | ||
+ | # [[Chiyoda Vacuum Flasher Vacuum Distillation Units]] | ||
+ | # [http://af.reuters.com/article/energyOilNews/idAFTOE69505420101006 Japan's JX considers closing Negishi refinery] | ||
+ | # [http://af.reuters.com/article/energyOilNews/idAFTOE6A004720101101 Japan's JX, Fuji Oil scrap CDUs] | ||
+ | # [http://www.noe.jx-group.co.jp/english/press/noc/2009/e71_enpr_091026.html Construction Completed for Japan’s first bio-ETBE Production Plant at Negishi Refinery] | ||
+ | |||
+ | [[category:Refinery]] | ||
+ | [[category:Japan]] | ||
+ | [[category:Eneos]] |
Latest revision as of 17:53, 19 January 2023
Contents
Summary Information
- Ownership: Nippon Oil
- Website: http://www.noe.jx-group.co.jp/english/
- List of Nippon Oil Refineries
- Location: Yokahama, Japan
- Capacity: 13.5 million tons/annum & 270,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A large high complexity refinery
Refining Units
- Atmospheric Distillation
- Vacuum Crude Oil Distillation - 130,000
- Residue Fluid Catalytic Cracking (RFCC) unit 40,000 bpd
- Catalytic Cracking - 83,000
- Alkylation - 9.000
- Catalytic Reforming - 50.000 + 14.000
- Desulfurisation
- Naphtha - 71.500
- FCC Gasoline - 28.000
- Middle Distillate - 137.500
- Coker 20,000 bpd (idled)
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- -
Products Produced
- -
Ongoing Projects
- The capacity of the refinery is being decreased with the closure of a 70,000 bpd distillation column in October 2010
Other Information
- -
History
- 1968 - Solvent Extraction Unit added
- 1983 - Visbreaker unit commissioned
- 1986 - Catalytic Reforming & Naphtha Desulphurisation Units started
- 1993 - Residuum Hydrodesulfurization Unit & Sulphur units commissioned
- 2009 - Construction Completed for Japan’s first bio-ETBE Production Plant
- 2010 - A 70,000 bpd distilation column was decommissioned
Relevant Links
- Chiyoda Visbreaking Units
- Chiyoda Catalytic Reforming Units
- Chiyoda Lubricating Oil Refining Units
- Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
- Chiyoda Residuum Hydrodesulfurization Units
- Chiyoda H2S Removal Units With Amine
- Chiyoda Sour Water Stripping Units
- Chiyoda Claus Tail Gas Treating Units
- Chiyoda Vacuum Flasher Vacuum Distillation Units
- Japan's JX considers closing Negishi refinery
- Japan's JX, Fuji Oil scrap CDUs
- Construction Completed for Japan’s first bio-ETBE Production Plant at Negishi Refinery