Summary Information | Summary Information | ||
− | * Operator: | + | * Operator: Shell |
* Country: Tunisia | * Country: Tunisia | ||
* Location: | * Location: | ||
Line 12: | Line 12: | ||
* The Miskar Gas Field is located in the Mediterranean Sea off the coast of Tunisia. It lies in 62m of water approximately 125km offshore in the Gulf of Gabes. | * The Miskar Gas Field is located in the Mediterranean Sea off the coast of Tunisia. It lies in 62m of water approximately 125km offshore in the Gulf of Gabes. | ||
** The development project included a drilling and production platform linked to an onshore terminal. | ** The development project included a drilling and production platform linked to an onshore terminal. | ||
− | ** A 24-inch export pipeline transmits gas and condensate under wellhead pressure the | + | ** A 24-inch export pipeline transmits gas and condensate under wellhead pressure the Shell-operated [[Hannibal Gas Processing Plant]] and sold into the Tunisian gas system. |
+++ Contractors | +++ Contractors |
Latest revision as of 19:40, 2 March 2024
Summary Information
- Operator: Shell
- Country: Tunisia
- Location:
- Production start: 1996
- Partners: 100% BG Group
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Miskar Gas Field is located in the Mediterranean Sea off the coast of Tunisia. It lies in 62m of water approximately 125km offshore in the Gulf of Gabes.
- The development project included a drilling and production platform linked to an onshore terminal.
- A 24-inch export pipeline transmits gas and condensate under wellhead pressure the Shell-operated Hannibal Gas Processing Plant and sold into the Tunisian gas system.
+++ Contractors
- **Penspen:** Detailed Design
- **Seaway Heavy Lifting:** Installation of the Miskar A platform
- **Acergy:** Installation, tie-in and commissioning of two 3 kilometre 10 inch diameter pipelines, together with a well control umbilical and riser, to tie back three subsea wells to the Miskar A platform
- **Saipem:** Pipeline installation
- **Aker Kvaerner:** Two glycol regeneration systems
- **Rosetti Marino:** Construction Engineering, Partial Procurement, Fabrication. Onshore Construction, Onshore Commissioning, Load-out, Seafastening, Transport and Tow for Miskar Compression Module
+++ History
- 1996 - Production begins at the field
- 1997 - Inauguration by the President
- 2002 - BG Tunisia awards contract to Bechtel for offshore compression
- 2006 - Acergy awarded pipeline contract
- 2015 - Shell becomes the operator after acquiring BG Group
+++ Geology
+++ Links
- Oil And Gas Concessions In Tunisia
- Seaway Heavy Lifting Oil And Gas References
- Penspen Offshore And Platform References
- Saipem Africa Pipeline References
- [[[Rosetti Marino Platform References]]
- BG Group Tunisia
- Miskar Gas Field Inaugurated by Tunisian President
- BG Tunisia awards major contract for offshore compression
- Acergy S.A. Awarded $65 million Contract in Tunisia
- Aker Kvaerner awarded process systems contracts
- Recommended cash and share offer for BG Group by Royal Dutch Shell