Difference between revisions of "Marjan Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 12: | Line 12: | ||
* The field extends into Iranian waters where it is known as [[Foroozan Oil Field]] | * The field extends into Iranian waters where it is known as [[Foroozan Oil Field]] | ||
* Associated gas is processed at the [[Khursaniyah Gas Processing Plant]] | * Associated gas is processed at the [[Khursaniyah Gas Processing Plant]] | ||
+ | ==== Marjan Increment Program ==== | ||
+ | * Crude oil production capacity at Marjan will be expanded by 300,000 barrels per day | ||
+ | * A new [[Tanajib Gas Processing Plant]] will have a gas processing capacity of 2.5 billion standard cubic feet per day | ||
+++ Contractors | +++ Contractors |
Revision as of 16:32, 17 January 2023
Summary Information
- Operator: Saudi Aramco
- Country: Saudi Arabia
- Location: Arabian Gulf
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field extends into Iranian waters where it is known as Foroozan Oil Field
- Associated gas is processed at the Khursaniyah Gas Processing Plant
Marjan Increment Program
- Crude oil production capacity at Marjan will be expanded by 300,000 barrels per day
- A new Tanajib Gas Processing Plant will have a gas processing capacity of 2.5 billion standard cubic feet per day
+++ Contractors
- **HHI:** Platform, Facilities Pile, Bridge
- **McDermott:**
- Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)
- Engineering, procurement, construction, installation (“EPCI”) and replacement of the decks of two existing tie-in platforms, as well as the removal and salvage of existing gas turbine generators, and the installation of two new 115kV subsea power and communication cables.
+++ History
- 2019 - Contracts awarded for increment program
+++ Geology
+++ Links
- Hyundai Heavy Industries Platform References
- McDermott Awarded North Dome and PDM Projects for Saudi Aramco
- McDermott Awarded Cable Installation Project for Saudi Aramco
- McDermott Awarded Initial Work for the Marjan Gas Oil Separation Plant (GOSP’s) Power Supply Generation System Offshore Saudi Arabia
- Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity