Difference between revisions of "Limay Refinery"

From A Barrel Full
Jump to navigation Jump to search
Line 27: Line 27:
 
-
 
-
 
=== History ===
 
=== History ===
1960 - Refinery commissioned
+
* 1960 - Refinery commissioned
2005 - Isomerization Unit and Gasoil Hydrotreater commissioned
+
* 2005 - Isomerization Unit and Gasoil Hydrotreater commissioned
2008 - Fluidized Catalytic Cracker and a Propylene Recovery Unit commssioned
+
* 2008 - Fluidized Catalytic Cracker and a Propylene Recovery Unit commssioned
2009 - Benzene, Toluene and Xylene unit starts production
+
* 2009 - Benzene, Toluene and Xylene unit starts production
2011 - Refinery upgrade project launched
+
* 2011 - Refinery upgrade project launched
 +
 
 
===  Links ===
 
===  Links ===
 
# [http://killajoules.wikidot.com/archive:petron-inaugurates-100-million-clean-air-facilities Petron Inaugurates $100-Million Clean Air Facilities at its Bataan Refinery]
 
# [http://killajoules.wikidot.com/archive:petron-inaugurates-100-million-clean-air-facilities Petron Inaugurates $100-Million Clean Air Facilities at its Bataan Refinery]

Revision as of 07:14, 4 January 2021

Summary Information

Ownership: Petron Website: http://www.petron.com/ Location: Limay, Bataan, Philippines Capacity: 9 million tons/annum & 180,000 bbl/day Nelson Complexity:

Refining Units

Atmospheric Distillation Vacuum Distillation Unit Isomerization Unit 10,000 bbl/day CCR Platformer - UOP - 17,000 bbl/day Gasoil Hydrotreater Fluidized Catalytic Cracker 19,000 bbl/day Penex unit - UOP - 10,000 bbl/day Propylene Recovery Unit BTX Unit

Terminal Capacity

Crude Oil: Refined Products:

Crude Supply

-

Products Produced

LPG, gasoline, diesel, jet fuel, kerosene, industrial fuel oil, solvents, asphalts, and the petrochemical feedstocks-mixed xylene and propylene.

Projects

The Bataan Limay Refinery Project will produce high value-added oil products by extensively modernizing existing refinery plants Other Information -

History

  • 1960 - Refinery commissioned
  • 2005 - Isomerization Unit and Gasoil Hydrotreater commissioned
  • 2008 - Fluidized Catalytic Cracker and a Propylene Recovery Unit commssioned
  • 2009 - Benzene, Toluene and Xylene unit starts production
  • 2011 - Refinery upgrade project launched

Links

  1. Petron Inaugurates $100-Million Clean Air Facilities at its Bataan Refinery
  2. Petron Corp. To Raise Capital For Retail Expansion, Refinery Upgrade
  3. Refinery Upgrade Project, Reuters
  4. Petron Corp. Begins Production of High-Value Petrochemical Feedstock Propylene
  5. New PenexTM Unit Completes Petron’s Naphtha Complex
  6. UOP Selected by Petron’s Bataan Refinery to Provide PetroFCC™ Technology
  7. Petron Corporation Unveils Major Refinery Expansion Plan