Kalingrad Floating LNG Terminal
Revision as of 11:19, 17 January 2022 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Gazprom * Website: https://www.gazprom.com/ * Location: Kaliningrad * Capacity: 1.5 million tons/annum * Status: In operation +++...")
Summary Information
- Ownership: Gazprom
- Website: https://www.gazprom.com/
- Location: Kaliningrad
- Capacity: 1.5 million tons/annum
- Status: In operation
+++ Brief Description
- A floating LNG regasification terminal named the Marshal Vasilevskiy FSRU
- The FSRU will combine excellent LNG storage (max capacity 174,100 cbm) and natural gas processing (max sendout 500 mmscf/day) capabilities with superior sea-going (speed up to 19.5 knots), energy efficiency (BOR below 0.09%/day) and ice (Arc 4 ice class from the Russian Maritime Register of Shipping) characteristics, which will enable the FSRU’s flexible utilisation as a regasification plant, an LNG shuttle or a conventional LNG carrier
- The gas is stored in the Kaliningradskoye UGS facility, created from salt caverns
+++ Technical Details
- Storage capacity: 174,100 cbm
- Unloading capacity:
- Send out capacity: 500 mmscf/day
- Constructor:
- **Hyundai Heavy:** Construction of vessel
- **Wärtsilä:** Gasification module
+++ Ongoing Projects/Project Status
- The project was commissioned in 2019
+++ Suppliers / Customers
- Suppliers: Gazprom
- Customers:
+++ History
- 2015 - HHI awarded construction contract
- 2019 - Terminal commissioned
+++ Other Information
- -