* The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities. | * The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities. | ||
* Gas is to be supplied by the Jawa Satu FSRU | * Gas is to be supplied by the Jawa Satu FSRU | ||
+ | * The FSRU will be placed 14km offshore in the Cilamaya Sea, east of Jakarta and connected to the power plant via a pipeline about 21km long. | ||
=== Technical Details === | === Technical Details === |
Revision as of 16:45, 16 March 2021
Contents
Summary Information
- Ownership:
- Website:
- Location: Cilamaya, West Java province, Java Island, Indonesia
- Capacity: million tons/annum
- Status:
Brief Description
- The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities.
- Gas is to be supplied by the Jawa Satu FSRU
- The FSRU will be placed 14km offshore in the Cilamaya Sea, east of Jakarta and connected to the power plant via a pipeline about 21km long.
Technical Details
- Storage capacity: 170,000 M3
- Unloading capacity:
- Send out capacity: 300 MMscfd
- Constructor:
- Licensor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers: LNG is to be supplied from BP’s Tangguh LNG Terminal in West Papua
- Customers: The terminal will supply a new power plant
History
- 2018 - The Asian development bank approved two loans totalling USD 370 million for the project