Difference between revisions of "Jawa-1 LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 35: Line 35:
 
-
 
-
 
=== Links ===
 
=== Links ===
#[https://www.adb.org/projects/51112-001/main Asian Development Bank]
+
# [https://www.adb.org/projects/51112-001/main Asian Development Bank]
 +
# [https://abarrelfull.blogspot.com/2021/03/mol-to-participate-in-construction.html MOL to Participate in Construction, Ownership, Operation of FSRU for Jawa 1 Gas-Fired IPP Project in Indonesia]

Revision as of 16:44, 16 March 2021

Summary Information

  • Ownership:
  • Website:
  • Location: Cilamaya, West Java province, Java Island, Indonesia
  • Capacity: million tons/annum
  • Status:

Brief Description

  • The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities.
  • Gas is to be supplied by the Jawa Satu FSRU

Technical Details

  • Storage capacity: 170,000 M3
  • Unloading capacity:
  • Send out capacity: 300 MMscfd
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers: LNG is to be supplied from BP’s Tangguh LNG Terminal in West Papua
  • Customers: The terminal will supply a new power plant

History

  • 2018 - The Asian development bank approved two loans totalling USD 370 million for the project

Other Information

-

Links

  1. Asian Development Bank
  2. MOL to Participate in Construction, Ownership, Operation of FSRU for Jawa 1 Gas-Fired IPP Project in Indonesia