Difference between revisions of "Jawa-1 LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 35: | Line 35: | ||
- | - | ||
=== Links === | === Links === | ||
− | #[https://www.adb.org/projects/51112-001/main Asian Development Bank] | + | # [https://www.adb.org/projects/51112-001/main Asian Development Bank] |
+ | # [https://abarrelfull.blogspot.com/2021/03/mol-to-participate-in-construction.html MOL to Participate in Construction, Ownership, Operation of FSRU for Jawa 1 Gas-Fired IPP Project in Indonesia] |
Revision as of 16:44, 16 March 2021
Contents
Summary Information
- Ownership:
- Website:
- Location: Cilamaya, West Java province, Java Island, Indonesia
- Capacity: million tons/annum
- Status:
Brief Description
- The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities.
- Gas is to be supplied by the Jawa Satu FSRU
Technical Details
- Storage capacity: 170,000 M3
- Unloading capacity:
- Send out capacity: 300 MMscfd
- Constructor:
- Licensor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers: LNG is to be supplied from BP’s Tangguh LNG Terminal in West Papua
- Customers: The terminal will supply a new power plant
History
- 2018 - The Asian development bank approved two loans totalling USD 370 million for the project
Other Information
-