Difference between revisions of "Jawa-1 LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...")
 
Line 7: Line 7:
 
* Status:  
 
* Status:  
 
=== Brief Description ===
 
=== Brief Description ===
 
+
* The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities. The LNG-to-power project is located about 100 kilometers (km) east of Jakarta on the Javanese coastline. The project will be developed and implemented by an independent power producer, PT. Jawa Power Satu, under a 25-year power purchase agreement (PPA) with the Indonesian utility company PLN.
  
 
=== Technical Details ===
 
=== Technical Details ===

Revision as of 16:21, 16 March 2021

Summary Information

  • Ownership:
  • Website:
  • Location:
  • Capacity: million tons/annum
  • Status:

Brief Description

  • The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities. The LNG-to-power project is located about 100 kilometers (km) east of Jakarta on the Javanese coastline. The project will be developed and implemented by an independent power producer, PT. Jawa Power Satu, under a 25-year power purchase agreement (PPA) with the Indonesian utility company PLN.

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 200X -

Other Information

-

Links

  1. Asian Development Bank