(Created page with "=== Summary Information === Also known as the Izmit Residuum Upgrading Project Ownership: Tupras Website: http://www.tupras.com.tr/ Wiki Page: Izmit Refinery Location: Izmit...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
Also known as the Izmit Residuum Upgrading Project
+
* Ownership: Tupras
 +
* Website: http://www.tupras.com.tr/
 +
* Wiki Page: [[Izmit Refinery]]
 +
* Location: Izmit, Turkey
 +
* Capacity: 11.0 million tons/annum & 220,000 bbl/day
 +
* Nelson Complexity:
 +
** Before: 7.78
 +
** After: 11.5
 +
* Project Stage: Construction
 +
* Expected Completion:  [[[Refinery Projects to be Completed in 2015 | 2015]]]
 +
* Budget: $2.38 Billion
  
Ownership: Tupras
+
=== The Project ===
Website: http://www.tupras.com.tr/
 
Wiki Page: Izmit Refinery
 
Location: Izmit, Turkey
 
Capacity: 11.0 million tons/annum & 220,000 bbl/day
 
Nelson Complexity:
 
Before: 7.78
 
After: 11.5
 
Project Stage: Construction
 
Expected Completion: 2015
 
Budget: $2.38 Billion
 
The Project
 
  
Project Type: Major upgrading
+
* Project Type: Major upgrading
Project Summary: The purpose of the project is to increase the conversion capacity of the Izmit refinery, which will enable it to process heavier and high sulphur content crude oils, to reduce the deficit of gasoil in Turkey and to adapt the refining projects to the EU environmental specifications.
+
* Project Summary: The purpose of the project is to increase the conversion capacity of the Izmit refinery, which will enable it to process heavier and high sulphur content crude oils, to reduce the deficit of gasoil in Turkey and to adapt the refining projects to the EU environmental specifications.
Main Contractors
+
* Main Contractors
Tecnicas Reunidas: EPC Contractor
+
** **Tecnicas Reunidas:** EPC Contractor
UOP: Hydrocracker Licence
+
** **UOP:** Hydrocracker Licence
GE: two gas turbines, one steam turbine and three generators for the Cogeneration unit
+
** **GE:** two gas turbines, one steam turbine and three generators for the Cogeneration unit
Refining Units
 
  
Hydrocracker (50,300 b/d),
+
=== Refining Units ===
Vacuum (47,200 b/d),
 
Delayed Coker (51,600 b/d),
 
Hydrogen (160,000 Nm3/h),
 
Sulphur Recovery (2x210 t/d),
 
Amine Regeneration (1,100 m3/d),
 
Sour Water Stripper unit (126 t/h)
 
Cogeneration unit (120 MW).
 
Terminal Capacity
 
  
Crude Oil:
+
* Hydrocracker (50,300 b/d),
Refined Products:
+
* Vacuum (47,200 b/d),
Crude Supply
+
* Delayed Coker (51,600 b/d),
 +
* Hydrogen (160,000 Nm3/h),
 +
* Sulphur Recovery (2x210 t/d),
 +
* Amine Regeneration (1,100 m3/d),
 +
* Sour Water Stripper unit (126 t/h)
 +
* Cogeneration unit (120 MW).
  
The project will enable the refinery to process heavier and high sulphur content crude oils
+
=== Terminal Capacity ===
Products Produced
 
  
LPG, Gasoline, Diesel & Petrocoke
+
* Crude Oil:
History
+
* Refined Products:
  
2008 - Project Launched
+
=== Crude Supply ===
2009 - Tecnicas Reunidas signs EPC contract
 
2011 - Tecnicas Reunidas signs a turnkey contract for the project
 
2012 - GE awarded CoGen contract
 
2015 - Project completed
 
Other Information
 
  
The Hydrocracking unit will be the one with the highest design pressure in the world, the Hydrogen unit will be the largest designed by TR and one of the largest globally and, the Flare, with 180 meters height, will the second tallest in the world.
+
* The project will enable the refinery to process heavier and high sulphur content crude oils
CESCE and SACE are guaranteeing majority of the financing for the projectp
+
 
 +
 
 +
=== Products Produced ===
 +
 
 +
* LPG, Gasoline, Diesel & Petrocoke
 +
 
 +
=== History ===
 +
 
 +
* 2008 - Project Launched
 +
* 2009 - Tecnicas Reunidas signs EPC contract
 +
* 2011 - Tecnicas Reunidas signs a turnkey contract for the project
 +
* 2012 - GE awarded CoGen contract
 +
* 2015 - Project completed
 +
 
 +
=== Other Information ===
 +
 
 +
* The Hydrocracking unit will be the one with the highest design pressure in the world, the Hydrogen unit will be the largest designed by TR and one of the largest globally and, the Flare, with 180 meters height, will the second tallest in the world.
 +
* CESCE and SACE are guaranteeing majority of the financing for the project
  
 
=== Links ===
 
=== Links ===
Line 61: Line 67:
 
# [http://killajoules.wikidot.com/blog:3601 GE to Supply Equipment and Services for Refinery Upgrade in Turkey]
 
# [http://killajoules.wikidot.com/blog:3601 GE to Supply Equipment and Services for Refinery Upgrade in Turkey]
 
# [http://killajoules.wikidot.com/archive:turkish-refiner-tuepras-using-honeywell-uop-unicrack Turkish Refiner Tüpraş Using Honeywell UOP Unicracking™ Technology To Boost Diesel Production]
 
# [http://killajoules.wikidot.com/archive:turkish-refiner-tuepras-using-honeywell-uop-unicrack Turkish Refiner Tüpraş Using Honeywell UOP Unicracking™ Technology To Boost Diesel Production]
 +
 +
 +
[[Category:Refinery]]
 +
[[Category:Turkey]]
 +
[[Category:Tupras]]

Latest revision as of 17:22, 25 April 2022

Summary Information

  • Ownership: Tupras
  • Website: http://www.tupras.com.tr/
  • Wiki Page: Izmit Refinery
  • Location: Izmit, Turkey
  • Capacity: 11.0 million tons/annum & 220,000 bbl/day
  • Nelson Complexity:
    • Before: 7.78
    • After: 11.5
  • Project Stage: Construction
  • Expected Completion: [[[Refinery Projects to be Completed in 2015 | 2015]]]
  • Budget: $2.38 Billion

The Project

  • Project Type: Major upgrading
  • Project Summary: The purpose of the project is to increase the conversion capacity of the Izmit refinery, which will enable it to process heavier and high sulphur content crude oils, to reduce the deficit of gasoil in Turkey and to adapt the refining projects to the EU environmental specifications.
  • Main Contractors
    • **Tecnicas Reunidas:** EPC Contractor
    • **UOP:** Hydrocracker Licence
    • **GE:** two gas turbines, one steam turbine and three generators for the Cogeneration unit

Refining Units

  • Hydrocracker (50,300 b/d),
  • Vacuum (47,200 b/d),
  • Delayed Coker (51,600 b/d),
  • Hydrogen (160,000 Nm3/h),
  • Sulphur Recovery (2x210 t/d),
  • Amine Regeneration (1,100 m3/d),
  • Sour Water Stripper unit (126 t/h)
  • Cogeneration unit (120 MW).

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The project will enable the refinery to process heavier and high sulphur content crude oils


Products Produced

  • LPG, Gasoline, Diesel & Petrocoke

History

  • 2008 - Project Launched
  • 2009 - Tecnicas Reunidas signs EPC contract
  • 2011 - Tecnicas Reunidas signs a turnkey contract for the project
  • 2012 - GE awarded CoGen contract
  • 2015 - Project completed

Other Information

  • The Hydrocracking unit will be the one with the highest design pressure in the world, the Hydrogen unit will be the largest designed by TR and one of the largest globally and, the Flare, with 180 meters height, will the second tallest in the world.
  • CESCE and SACE are guaranteeing majority of the financing for the project

Links

  1. Técnicas Reunidas closes the largest contract ever with the Turkish Oil Company Tüpras
  2. SACE guarantees US$ 624 million to modernise the Izmit refinery in Turkey
  3. An Investment from Tüpraş to Raise Productivity & Profit
  4. GE to Supply Equipment and Services for Refinery Upgrade in Turkey
  5. Turkish Refiner Tüpraş Using Honeywell UOP Unicracking™ Technology To Boost Diesel Production