Difference between revisions of "East African Crude Oil Pipeline (EACOP)"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 28: | Line 28: | ||
# [https://a-barrel-full.blogspot.com/2021/04/uganda-and-tanzania-final-agreements.html Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project] | # [https://a-barrel-full.blogspot.com/2021/04/uganda-and-tanzania-final-agreements.html Uganda And Tanzania: Final Agreements For The Lake Albert Resources Development Project] | ||
+ | |||
+ | [[category:Pipeline]] | ||
+ | [[category:Tanzania]] | ||
+ | [[category:Uganda]] | ||
+ | [[category:Total]] | ||
+ | [[category:CNOOC]] |
Revision as of 09:51, 28 June 2023
Contents
Summary Information
- Source: Uganda
- Destination: Tanzania
- Ownership: EACOP
- Website: https://eacop.com/
- Length: 1,443 kilometres ( miles)
- Capacity: barrels of oil per day
- Crude Type:
Brief Description
- EACOP is a 1,443km crude oil export pipeline system that will transport Uganda’s crude oil from Kabaale – Hoima in Uganda to a maritime port facility on the Chongoleani peninsula near Tanga in Tanzania. This export system, (296km in Uganda and 1,147km in Tanzania), comprises a 24inch insulated buried pipeline, 6 Pumping stations (2 in Uganda and 4 in Tanzania), and a marine export terminal.
- It will transport the oil from the Kingfisher Oil Field and the Tilenga Oil Field
Pipeline Status
- Planned
History
- 2017 - Uganda and Tanzania sign intergovernmental agreement
- 2021 - Final agreement signed between Uganda and Tanzania
Other Information
- -