Difference between revisions of "Driftwood LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(22 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Tellurian |
− | * Website: | + | * Website: https://www.tellurianinc.com/ |
− | * Location: | + | * Location: Calcasieu River, south of Lake Charles, Louisiana |
− | * Capacity: million tons/annum | + | * Capacity: 27 million tons/annum |
− | * Status: | + | * Status: Planned |
=== Brief Description === | === Brief Description === | ||
− | * | + | * The LNG Facility, includes five LNG plant facilities to liquefy natural gas, three tanks to store the LNG, LNG carrier loading/berthing facilities (Marine Facility), and other utilities |
+ | * Construction and operation of about 96 miles of pipeline, three new compressor stations, and 15 new meter stations. | ||
=== Technical Details === | === Technical Details === | ||
* Storage capacity: | * Storage capacity: | ||
− | * Constructor: | + | * Constructor: |
+ | ** Bechtel: lump-sum turn key engineering, procurement and construction contract | ||
* Licensor: | * Licensor: | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * | + | * Construction has begun in 2022 and commissioning is expected in [[LNG Terminal Projects to be Completed in 2025 | 2025]] |
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: | + | * Suppliers: The Driftwood Pipeline will have interconnects with the [[ANR Pipeline Company]], Cameron Pipeline, Creole Trail Pipeline, [[Tennessee Gas Pipeline]], [[Texas Eastern Transmission Gas Pipeline]] and [[Trunkline Gas Company Pipeline]] |
− | * Customers: | + | * Customers: |
+ | ** Vitol - 3mtpa | ||
+ | ** Gunvor - 3mtpa | ||
+ | ** Total - 2.5mtpa | ||
=== History === | === History === | ||
+ | * 2017 - Bechtel awarded construction contracts | ||
+ | * 2019 - The final environmental impact assessment was completed | ||
+ | * 2019 - Total becomes a shareholder and signs gas purchase agreements | ||
* 2021 - Tellurian signed sales contracts with Gunvor and Vitol | * 2021 - Tellurian signed sales contracts with Gunvor and Vitol | ||
+ | * 2022 - Construction of the facility started | ||
=== Other Information === | === Other Information === | ||
Line 29: | Line 38: | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2022/02/bechtel-to-deliver-276-mtpa-driftwood.html Bechtel to Deliver 27.6 MTPA Driftwood LNG Project for Tellurian] | ||
+ | # [https://abarrelfull.blogspot.com/2022/02/total-further-commits-to-tellurian-led.html Total further commits to Tellurian-led Driftwood LNG project through 2.5 Mtpa of LNG offtake and equity investments] | ||
+ | # [https://abarrelfull.blogspot.com/2022/02/final-environmental-impact-statement.html Final Environmental Impact Statement- Driftwood LNG, LLC and Driftwood Pipeline, LLC, collectively Driftwood] | ||
# [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng.html Tellurian and Gunvor sign 10-year LNG agreement for 3 mtpa] | # [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng.html Tellurian and Gunvor sign 10-year LNG agreement for 3 mtpa] | ||
+ | # [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng_4.html Tellurian and Vitol sign 10-year LNG agreement for 3 mtpa] | ||
+ | # [https://lng-news.blogspot.com/2022/03/tellurians-driftwood-lng-begins.html Tellurian’s Driftwood LNG Begins Construction] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:USA]] |
Latest revision as of 14:40, 28 March 2022
Contents
Summary Information
- Ownership: Tellurian
- Website: https://www.tellurianinc.com/
- Location: Calcasieu River, south of Lake Charles, Louisiana
- Capacity: 27 million tons/annum
- Status: Planned
Brief Description
- The LNG Facility, includes five LNG plant facilities to liquefy natural gas, three tanks to store the LNG, LNG carrier loading/berthing facilities (Marine Facility), and other utilities
- Construction and operation of about 96 miles of pipeline, three new compressor stations, and 15 new meter stations.
Technical Details
- Storage capacity:
- Constructor:
- Bechtel: lump-sum turn key engineering, procurement and construction contract
- Licensor:
Ongoing Projects/Project Status
- Construction has begun in 2022 and commissioning is expected in 2025
Suppliers / Customers
- Suppliers: The Driftwood Pipeline will have interconnects with the ANR Pipeline Company, Cameron Pipeline, Creole Trail Pipeline, Tennessee Gas Pipeline, Texas Eastern Transmission Gas Pipeline and Trunkline Gas Company Pipeline
- Customers:
- Vitol - 3mtpa
- Gunvor - 3mtpa
- Total - 2.5mtpa
History
- 2017 - Bechtel awarded construction contracts
- 2019 - The final environmental impact assessment was completed
- 2019 - Total becomes a shareholder and signs gas purchase agreements
- 2021 - Tellurian signed sales contracts with Gunvor and Vitol
- 2022 - Construction of the facility started
Other Information
- -
Links
- Bechtel to Deliver 27.6 MTPA Driftwood LNG Project for Tellurian
- Total further commits to Tellurian-led Driftwood LNG project through 2.5 Mtpa of LNG offtake and equity investments
- Final Environmental Impact Statement- Driftwood LNG, LLC and Driftwood Pipeline, LLC, collectively Driftwood
- Tellurian and Gunvor sign 10-year LNG agreement for 3 mtpa
- Tellurian and Vitol sign 10-year LNG agreement for 3 mtpa
- Tellurian’s Driftwood LNG Begins Construction