Difference between revisions of "Campana Refinery Expansion Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
* Nelson Complexity: | * Nelson Complexity: | ||
* Project Stage: Under construction | * Project Stage: Under construction | ||
− | * Expected Completion: | + | * Expected Completion: 2022 |
− | * Budget: | + | * Budget: $900 million |
=== The Project === | === The Project === | ||
Line 20: | Line 20: | ||
** The project, aims to expand the refinery’s crude processing capacity and to increase refining depth | ** The project, aims to expand the refinery’s crude processing capacity and to increase refining depth | ||
** It will produce ultra-low sulfur diesel and gasoline (diesel + 1,200,000 m3/year and gasoline + 650,000 m3/year) | ** It will produce ultra-low sulfur diesel and gasoline (diesel + 1,200,000 m3/year and gasoline + 650,000 m3/year) | ||
+ | ** Phase II includes a new preheating train to the primary distillation unit, replacing the reformer’s fired heater, catalytic cracker revamp, replacing the two coke drums, conversion of diesel hydrotreater unit into a naphtha hydrotreater | ||
* Main Contractors: | * Main Contractors: | ||
** Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer | ** Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer | ||
+ | ** PROSERNAT: Modular supply of a complete Sulphur Block including Fuel Gas Treating Unit, Amine Regeneration Unit, double stage Sour Water Stripper Unit, Claus Unit, Tail Gas treatment Unit | ||
* Licences: | * Licences: | ||
** | ** | ||
Line 40: | Line 42: | ||
=== Crude Supply === | === Crude Supply === | ||
+ | * The additional crude required by the refinery as a result of the expansion will be supplied by pipeline, requiring an expansion of the main pipeline | ||
− | |||
=== Products Produced === | === Products Produced === | ||
+ | * The refinery will produce much greater quantities of ULSD and Gasoline | ||
− | |||
=== History === | === History === | ||
− | * | + | * 2016 - IFC awarded the first loan |
+ | * 2017 - Hytec awarded basic engineering contract | ||
+ | * 2019 - IFC awarded the second loan | ||
=== Other Information === | === Other Information === | ||
* IFC has made two loans for the project | * IFC has made two loans for the project | ||
− | ** | + | ** US$135 million of a US$500 million package in 2019 |
+ | ** US$78 million of a US$378 million package in 2016 | ||
=== Links === | === Links === | ||
Line 61: | Line 66: | ||
[[category:Refinery]] | [[category:Refinery]] | ||
+ | [[Category:Argentina]] |
Latest revision as of 10:11, 31 March 2020
Contents
Summary Information
- Ownership: Axion Energy / Pan American Energy
- Website:
- Wiki Page: Axion Campana Refinery
- Location:
- Capacity:
- Before: 4.5 million tons/annum & 90,000 bbl/day
- After: 6.0 million tons/annum & 120,000 bbl/day
- Nelson Complexity:
- Project Stage: Under construction
- Expected Completion: 2022
- Budget: $900 million
The Project
- Project Type: Expansion and upgrade
- Project Summary:
- The project, aims to expand the refinery’s crude processing capacity and to increase refining depth
- It will produce ultra-low sulfur diesel and gasoline (diesel + 1,200,000 m3/year and gasoline + 650,000 m3/year)
- Phase II includes a new preheating train to the primary distillation unit, replacing the reformer’s fired heater, catalytic cracker revamp, replacing the two coke drums, conversion of diesel hydrotreater unit into a naphtha hydrotreater
- Main Contractors:
- Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer
- PROSERNAT: Modular supply of a complete Sulphur Block including Fuel Gas Treating Unit, Amine Regeneration Unit, double stage Sour Water Stripper Unit, Claus Unit, Tail Gas treatment Unit
- Licences:
Refining Units
- Crude unit - revamp
- Reformer - revamp
- Naphtha and Diesel hydrotreaters
- Delayed coker
- Sulfur recovery unit
- Sour water stripper
- Sour gas scrubbers
- Amine regeneration system
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The additional crude required by the refinery as a result of the expansion will be supplied by pipeline, requiring an expansion of the main pipeline
Products Produced
- The refinery will produce much greater quantities of ULSD and Gasoline
History
- 2016 - IFC awarded the first loan
- 2017 - Hytec awarded basic engineering contract
- 2019 - IFC awarded the second loan
Other Information
- IFC has made two loans for the project
- US$135 million of a US$500 million package in 2019
- US$78 million of a US$378 million package in 2016
Links
- Hytech Downstream References
- Axion Energy awards Hytech a Basic and Detailed Engineering contract to develop the revamp of the Campana Refinery Powerformer and Atmospheric Distillation
- IFC project summary
- IFC helps Argentina meet energy needs with $378 million in long term loans to Axion Energy
- IFC helps Argentina meet energy needs with $500 million loan to Pan American Energy