Difference between revisions of "CP2 LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
Line 2: Line 2:
  
 
* Ownership: Venture Global
 
* Ownership: Venture Global
* Website:  
+
* Website: https://venturegloballng.com/
* Location:
+
* Location: Cameron Parish, Louisiana
 
* Capacity: 20.0 million tons/annum  
 
* Capacity: 20.0 million tons/annum  
 
* Status: Planned
 
* Status: Planned

Revision as of 15:08, 20 December 2021

Summary Information

  • Ownership: Venture Global
  • Website: https://venturegloballng.com/
  • Location: Cameron Parish, Louisiana
  • Capacity: 20.0 million tons/annum
  • Status: Planned

Brief Description

  • A liquefied natural gas (LNG) terminal with a nameplate liquefaction capacity of 20 million metric tonnes per annum (MTPA) of LNG and a peak capacity of approximately 24 MTPA

Technical Details

  • Storage capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 202X

Suppliers / Customers

  • Suppliers: The CP Express pipeline will provide natural gas to the CP2 LNG facility
  • Customers:

History

  • 2021 - Venture Global announced the project

Other Information

  • -

Relevant Links

  1. Venture Global and Louisiana Governor John Bel Edwards Announce Proposed CP2 LNG Export Facility