CP2 LNG Export Terminal Project
Jump to navigation
Jump to search
Contents
Summary Information
- Ownership: Venture Global
- Website: https://venturegloballng.com/
- Location: Cameron Parish, Louisiana
- Capacity: 20.0 million tons/annum
- Status: Planned
Brief Description
- A liquefied natural gas (LNG) terminal with a nameplate liquefaction capacity of 20 million metric tonnes per annum (MTPA) of LNG and a peak capacity of approximately 24 MTPA. The project will be built in 2 phases
- It will have 18 liquefaction blocks, each with a nameplate capacity of approximately 1.1 MTPA of LNG (9 blocks per phase)and Four 200,000 m3 full containment LNG storage tanks (two tanks per phase) and Two marine loading berths
- There will be an on-site combined cycle gas turbine power plant with a nameplate capacity of 1,440 MW (~720 MW per phase)
- The plant will effectively be a carbon copy of Venture Global’s Calcasieu Pass LNG and Plaquemines LNG facilities
- CP Express will build, own and operate a new 48-inch-diameter pipeline approximately 85.1 miles in length and a new 24-inch diameter lateral pipeline approximately 5.9 miles in length, connecting the CP2 LNG terminal to the existing natural gas pipeline grid in east Texas and southwest Louisiana.
Technical Details
- Storage capacity: 4x 200,000 m3 full containment LNG storage tanks
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning of phase one is expected in 2026
Suppliers / Customers
- Suppliers: The CP Express pipeline will provide natural gas to the CP2 LNG facility
- Customers:
- EnBW - 0.75 mtpa
- Inpex - 1.0 mtpa
History
- 2021 - Venture Global announced the project
- 2022 - EnBW signed a contract to buy 0.75 mtpa
Other Information
- -