Anaconda Natural Gas Pipeline
Revision as of 10:13, 15 September 2023 by Abarrelfull (talk | contribs)
Summary Information
- Source: Green Canyon
- Destination: Neptune Gas plant
- Ownership:
- Website: http://www.enterpriseproducts.com/
- Length: kilometres (183 miles)
- Capacity: per day
- Status: Operating
Details
- Offshore natural gas pipeline that connects the Kings Quay Oil and Gas Fields, Marco Polo Oil and Gas Field and Typhoon Oil Field in the Green Canyon area of the Gulf of Mexico to the ANR Pipeline Company system.
- The pipeline was later connected to the Constitution Oil and Gas Field
- Gas is transported to the Neptune Gas Processing Plant
History
- 2006 - First gas from
- 2011 - Pipeline connected to Neptune Gas Plant
- 2015 - Genesis agrees to acquire the pipeline
- 2022 - First gas from Kings Quay