Summary Information

  • Operator: Total
  • Country: Nigeria
  • Location: Oil Mining Lease (OML) 102
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The platform weighs approximately 13,000 tons and it is 54m long, 47m wide and 30m high. This platform can produce an amount of 105,000 barrels of crude petroleum and 3 million m³ of natural gas
  • The associated gas of the Ofon field is compressed, evacuated to shore to the [[[Nigeria LNG Terminal]]]

Contractors

  • **HHI** Offshore fixed platform
  • **McDermott:** Construction of four-level production deck
  • **Technip:** Loading, transport and installation of the topsides for the OFP2 fixed platform
  • **JDR:** Two five kilometre length subsea power cables, in addition to topside termination equipment and connection boxes
  • **Saipem:** OFP2
    • Living Quarters - Basic Engineering
    • Modifications and Tie-in Activities - Detail Engineering

History

  • 2007 - HHI awarded contract for offshore fixed platform
  • 2012 - Total launches Phase 2 Development of Offshore Ofon Field
  • 2015 - Compression project completed, and flaring ended

Geology

Links

  1. Hyundai Heavy Industries Platform References
  2. McDermott Platform References
  3. Saipem Saipem Fixed Offshore Production Facilities Major Projects
  4. Saipem Fixed Offshore Production Facilities Engineering Refe
  5. Serimax Africa Pipeline References
  6. Nigeria: Total launches Phase 2 Development of Offshore Ofon Field
  7. HHI Wins a $520 Million Platform Order from Nigeria
  8. JDR Awarded Subsea Power Cable Contract For Total Ofon Field
  9. Technip awarded contract for the loading, transport and installation of a production platform in Nigeria
  10. Nigeria: Total achieves flare-out on its operated Ofon field