Meeker Natural Gas Processing Plant

From A Barrel Full
Revision as of 12:19, 5 July 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Enterprise * Website: http://www.enterpriseproducts.com/ * Location: Colorado * Capacity: 1.5 billion cubic feet per day (Bcf/d) +++ Brief...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • The plant has a capacity of 1.5 billion cubic feet per day (Bcf/d) of natural gas and is capable of extracting up to 70,000 barrels per day (BPD) of natural gas liquids (NGLs).
  • The plant processes natural gas produced in the Piceance Basin
  • Natural gas liquids are transported on the Mid America NGL Pipeline System and the Chaparral NGL Pipeline
  • Gas is transported on the Questar Pipeline Company

++++ Related Oil and Gas Fields

  • The plant processes gas produced in fields of the Piceance Basin

+++ Ongoing Projects

  • -

+++ Other Information

  • -

+++ History

  • 2007 - Phase I entered production
  • 2009 - Phase II is commissioned

+++ Relevant Links

  1. Enterprise Begins Service at Meeker Natural Gas Processing Facility in Piceance Basin
  2. Enterprise Begins Service at Meeker II and Expands Three Other Natural Gas Processing Facilities