Peciko Gas Field
Revision as of 14:26, 12 December 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Total * Country: Indonesia * Location: Offshore Mahakam Block -3.36 * Production start: 1999 * Partners: Total - 50%, Inpex - 50% * Type: Gas...")
Summary Information
- Operator: Total
- Country: Indonesia
- Location: Offshore Mahakam Block -3.36
- Production start: 1999
- Partners: Total - 50%, Inpex - 50%
- Type: Gas & Condensate
- Estimated Reserves: 6.2 trillion cubic feet (tcf)
- Production Volume:
+++ Description
- Peciko gas field is located offshore from the Mahakam river delta, on the East Kalimantan
- The gas is transported through a 25-kilometer pipeline to an onshore processing plant in the Senipah area, where the gas undergoes preprocessing before being transmitted to the Bontang LNG Terminal through an 80-kilometer pipeline for liquefaction.
- Phase 1 included 2 production platforms
+++ Contractors
- **Punj Lloyd:** Phase 4 - Engineering, procurement and supply of materials, construction, pre-commissioning and commissioning assistance for two gas compression trains at onshore plant at Senipah on EPC basis, with a gas capacity of 450 MMSCFD for each train
- **PT Nippon Steel Construction Indonesia:** EPCI Contract to construct and install one offshore SWP-F platform (3,400 ton) and subsea pipeline (20” x 4.7km) for Peciko Phase 5
- **Saipem:** Field Development Phase IV (PCK 4 EPSC2) - platforms and sealines
+++ History
- 1997 - PSC signed
- 1999 - First gas produced
+++ Geology
+++ Links
- Indonesia Exploration And Production Blocks
- Punj Lloyd Refining References
- Saipem Pipeline References
- Saipem Fixed Offshore Production Facilities Project References
- Total inaugurates Peciko gas field in East Kalimantan
- PT Nippon Steel Construction Indonesia is awarded for Peciko by Total E&P Indonesie