Joslyn Oil Sands Project
Revision as of 15:19, 27 April 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Total * Country: Canada * Location: Fort McMurray, Alberta * Production start: * Partners: Total - 38.25%, Suncor - 36.75%, Occidental Petrol...")
Summary Information
- Operator: Total
- Country: Canada
- Location: Fort McMurray, Alberta
- Production start:
- Partners: Total - 38.25%, Suncor - 36.75%, Occidental Petroleum - 15% and Inpex - 10%
- Type: Bitumen
- Estimated Reserves:
- Production Volume:
+++ Description
- The mine is located outside Fort McMurray, Alberta and is designed to produce a projected 100,000 barrels of bitumen per day over the 20-year economic life of the Project.
+++ Contractors
- **Aker Solutions:** 1 high temperature, skid mounted Treater Package c/w insulation; desand system & end mounted building - 8 ID x 25
+++ History
- 2011 - Suncor acquires a 36.75% stake in the project
- 2012 - The Joint Review Panel approved the project
+++ Geology
+++ Links