Summary Information

  • Operator: Canadian Natural Resources
  • Country: Canada
  • Location: Fort McMurray, Alberta
  • Production start:
  • Partners: Canadian Natural Resources - 100%
  • Type: Bitumen
  • Estimated Reserves:
  • Production Volume:

Description

  • The mine is located outside Fort McMurray, Alberta and is designed to produce a projected 100,000 barrels of bitumen per day over the 20-year economic life of the Project.

Contractors

  • **Aker Solutions:** 1 high temperature, skid mounted Treater Package c/w insulation; desand system & end mounted building - 8 ID x 25

History

  • 2011 - Suncor acquires a 36.75% stake in the project
  • 2012 - The Joint Review Panel approved the project
  • 2018 - CNR acquire 100% of the project

Geology

Links

  1. Total and Suncor form a strategic alliance in Canada’s oil sands
  2. Total E&P Canada Ltd acknowledges favourable decision regarding its 100,000 barrel-per-day Joslyn North Mine
  3. TOTAL acknowledges receipt of federal Order in Council for Joslyn North Mine Project
  4. Canadian Natural Resources Limited Announces Acquisition Of 100% Working Interest In The Joslyn Oil Sands Project