Joslyn Oil Sands Project
Jump to navigation
Jump to search
Summary Information
- Operator: Canadian Natural Resources
- Country: Canada
- Location: Fort McMurray, Alberta
- Production start:
- Partners: Canadian Natural Resources - 100%
- Type: Bitumen
- Estimated Reserves:
- Production Volume:
Description
- The mine is located outside Fort McMurray, Alberta and is designed to produce a projected 100,000 barrels of bitumen per day over the 20-year economic life of the Project.
Contractors
- **Aker Solutions:** 1 high temperature, skid mounted Treater Package c/w insulation; desand system & end mounted building - 8 ID x 25
History
- 2011 - Suncor acquires a 36.75% stake in the project
- 2012 - The Joint Review Panel approved the project
- 2018 - CNR acquire 100% of the project
Geology
Links
- Total and Suncor form a strategic alliance in Canada’s oil sands
- Total E&P Canada Ltd acknowledges favourable decision regarding its 100,000 barrel-per-day Joslyn North Mine
- TOTAL acknowledges receipt of federal Order in Council for Joslyn North Mine Project
- Canadian Natural Resources Limited Announces Acquisition Of 100% Working Interest In The Joslyn Oil Sands Project