Joslyn Oil Sands Project

From A Barrel Full
Revision as of 15:19, 27 April 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Total * Country: Canada * Location: Fort McMurray, Alberta * Production start: * Partners: Total - 38.25%, Suncor - 36.75%, Occidental Petrol...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: Total
  • Country: Canada
  • Location: Fort McMurray, Alberta
  • Production start:
  • Partners: Total - 38.25%, Suncor - 36.75%, Occidental Petroleum - 15% and Inpex - 10%
  • Type: Bitumen
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The mine is located outside Fort McMurray, Alberta and is designed to produce a projected 100,000 barrels of bitumen per day over the 20-year economic life of the Project.

+++ Contractors

  • **Aker Solutions:** 1 high temperature, skid mounted Treater Package c/w insulation; desand system & end mounted building - 8 ID x 25

+++ History

  • 2011 - Suncor acquires a 36.75% stake in the project
  • 2012 - The Joint Review Panel approved the project

+++ Geology

+++ Links

  1. Total and Suncor form a strategic alliance in Canada’s oil sands
  2. Total E&P Canada Ltd acknowledges favourable decision regarding its 100,000 barrel-per-day Joslyn North Mine
  3. TOTAL acknowledges receipt of federal Order in Council for Joslyn North Mine Project