Cameia and Golfinho Oil Fields

From A Barrel Full
Revision as of 07:02, 22 May 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Operator: Total
  • Country: Angola
  • Location: Kwanza basin, offshore
  • Production start: expected 2028
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: Target is 70,000 bpd

Description

  • The development which is known as the Kaminho project is the first large deepwater development in the Kwanza basin
  • It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading, The Kaminho FPSO, which will be connected to a subsea production network.
  • Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs. * Production start-up is expected in 2028, with a plateau of 70,000 barrels of oil per day.

Contractors

  • -

History

  • 2024 - FID made for the project

Geology

Links