Kaminho FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

Brief Description

  • It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading vessel
  • Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs.

Contractors

  • Saipem:
    • Engineering, Procurement, Construction, Transportation and Commissioning of the Kaminho Floating Production Storage and Offloading (FPSO) vessel
    • Operation and Maintenance (O&M) of the FPSO for a firm period of 12 years

Status

  • Under construction

History

  • 2024 - Saipem awarded EPCTC contract

Other Information

  • -

Links

  1. Saipem: three new contracts awarded by TotalEnergies E&P Angola Block 20 for the Kaminho project for an overall amount of 3.7 billion USD