Cameia and Golfinho Oil Fields
Revision as of 07:02, 22 May 2024 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Total
- Country: Angola
- Location: Kwanza basin, offshore
- Production start: expected 2028
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: Target is 70,000 bpd
Description
- The development which is known as the Kaminho project is the first large deepwater development in the Kwanza basin
- It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading, The Kaminho FPSO, which will be connected to a subsea production network.
- Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs. * Production start-up is expected in 2028, with a plateau of 70,000 barrels of oil per day.
Contractors
- -
History
- 2024 - FID made for the project