Pegaga Gas Field

From A Barrel Full
Revision as of 08:24, 22 March 2023 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Operator:
  • Country:
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.

The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate. The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu.

Contractors

  • -

History

  • 2018 - Final investment decision taken

Geology

Links

  1. Pegaga Gas Development in Malaysia Approved