Pegaga Gas Field
Revision as of 08:24, 22 March 2023 by Abarrelfull (talk | contribs)
Summary Information
- Operator:
- Country:
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.
The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate. The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu.
Contractors
- -
History
- 2018 - Final investment decision taken