Summary Information
- Operator: Mubadala
- Country: Malaysia
- Location: Block SK 320 offshore
- Production start: 2022
- Partners: Mubadala, Petronas, Shell
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.
- The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.
- The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu.
Contractors
- Sapura Fabrication: Engineering, Procurement, Construction, Installation & Commissioning (EPCIC)
History
- 2018 - Final investment decision taken
- 2022 - First gas produced