Difference between revisions of "Enterprise Aegis Ethane Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Source: Mont Belvieu, Texas
 
* Source: Mont Belvieu, Texas
Line 9: Line 9:
 
* Product Type: Ethane
 
* Product Type: Ethane
  
+++ Brief Description
+
=== Brief Description ===
  
 
* The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections:
 
* The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections:
Line 18: Line 18:
 
* The pipeline is 20 inches
 
* The pipeline is 20 inches
  
+++ Pipeline Status
+
=== Pipeline Status ===
 
* All sections are in operation
 
* All sections are in operation
  
+++ History
+
=== History ===
 
* 2013 - Enterprise launches the project
 
* 2013 - Enterprise launches the project
 
* 2014 - The first stage of the pipeline is completed
 
* 2014 - The first stage of the pipeline is completed
Line 28: Line 28:
 
* 2015 - Open season for expansion
 
* 2015 - Open season for expansion
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
 
# [[EIA Liquids Pipeline Projects 2015-2020]]
 
# [[EIA Liquids Pipeline Projects 2015-2020]]
 
# [http://killajoules.wikidot.com/blog:3943 Enterprise Announces Gulf Coast Ethane Pipeline]
 
# [http://killajoules.wikidot.com/blog:3943 Enterprise Announces Gulf Coast Ethane Pipeline]

Latest revision as of 16:07, 25 September 2023

Summary Information

  • Source: Mont Belvieu, Texas
  • Destination: Mississippi River, Louisiana
  • Ownership: Enterprise
  • Website: http://www.enterpriseproducts.com/
  • Length: kilometres (270 miles)
  • Capacity: 425,000 barrels per day of ethane
  • Product Type: Ethane

Brief Description

  • The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections:
    • Section one is a 60-mile pipeline system designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to Beaumont, Texas
    • Section 2 connects Beaumont to Lake Charles, Louisiana and is 48 miles
    • Section 3 connects the pipeline to Napoleonville, Louisiana and is 162 miles
    • It supplies petrochemical facilities in Texas and Louisiana.
  • The pipeline is 20 inches

Pipeline Status

  • All sections are in operation

History

  • 2013 - Enterprise launches the project
  • 2014 - The first stage of the pipeline is completed
  • 2015 - Open season for expansion
  • 2015 - Second stage completed
  • 2015 - Open season for expansion

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2015-2020
  2. Enterprise Announces Gulf Coast Ethane Pipeline
  3. Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
  4. Enterprise to Increase Capacity on Aegis Ethane Pipeline; Conducts Supplemental Open Season
  5. Enterprise Completes Initial Segment of Aegis Ethane Pipeline
  6. Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
  7. Enterprise Signs Additional Commitment for Aegis Ethane Pipeline
  8. Enterprise Completes Second Segment of Aegis Ethane Pipeline
  9. Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
  10. Enterprise Completes Final Segment of Aegis Pipeline