Difference between revisions of "Enterprise Aegis Ethane Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Source: Mont Belvieu, Texas | * Source: Mont Belvieu, Texas | ||
Line 9: | Line 9: | ||
* Product Type: Ethane | * Product Type: Ethane | ||
− | + | === Brief Description === | |
* The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections: | * The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections: | ||
Line 18: | Line 18: | ||
* The pipeline is 20 inches | * The pipeline is 20 inches | ||
− | + | === Pipeline Status === | |
* All sections are in operation | * All sections are in operation | ||
− | + | === History === | |
* 2013 - Enterprise launches the project | * 2013 - Enterprise launches the project | ||
* 2014 - The first stage of the pipeline is completed | * 2014 - The first stage of the pipeline is completed | ||
Line 28: | Line 28: | ||
* 2015 - Open season for expansion | * 2015 - Open season for expansion | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [[EIA Liquids Pipeline Projects 2015-2020]] | # [[EIA Liquids Pipeline Projects 2015-2020]] | ||
# [http://killajoules.wikidot.com/blog:3943 Enterprise Announces Gulf Coast Ethane Pipeline] | # [http://killajoules.wikidot.com/blog:3943 Enterprise Announces Gulf Coast Ethane Pipeline] |
Latest revision as of 16:07, 25 September 2023
Contents
Summary Information
- Source: Mont Belvieu, Texas
- Destination: Mississippi River, Louisiana
- Ownership: Enterprise
- Website: http://www.enterpriseproducts.com/
- Length: kilometres (270 miles)
- Capacity: 425,000 barrels per day of ethane
- Product Type: Ethane
Brief Description
- The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections:
- Section one is a 60-mile pipeline system designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to Beaumont, Texas
- Section 2 connects Beaumont to Lake Charles, Louisiana and is 48 miles
- Section 3 connects the pipeline to Napoleonville, Louisiana and is 162 miles
- It supplies petrochemical facilities in Texas and Louisiana.
- The pipeline is 20 inches
Pipeline Status
- All sections are in operation
History
- 2013 - Enterprise launches the project
- 2014 - The first stage of the pipeline is completed
- 2015 - Open season for expansion
- 2015 - Second stage completed
- 2015 - Open season for expansion
Other Information
- -
Links
- EIA Liquids Pipeline Projects 2015-2020
- Enterprise Announces Gulf Coast Ethane Pipeline
- Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
- Enterprise to Increase Capacity on Aegis Ethane Pipeline; Conducts Supplemental Open Season
- Enterprise Completes Initial Segment of Aegis Ethane Pipeline
- Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
- Enterprise Signs Additional Commitment for Aegis Ethane Pipeline
- Enterprise Completes Second Segment of Aegis Ethane Pipeline
- Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
- Enterprise Completes Final Segment of Aegis Pipeline