Summary Information
+
=== Summary Information ===
  
 
* Source: El Encino, in the state of Chihuahua
 
* Source: El Encino, in the state of Chihuahua
Line 7: Line 7:
 
* Length:  530 kilometres (329 miles)  
 
* Length:  530 kilometres (329 miles)  
 
* Capacity: 670 million cubic feet per day  
 
* Capacity: 670 million cubic feet per day  
* Status: Inoperation
+
* Status: In operation
  
+++ Details
+
=== Details ===
 
* The 30-inch diameter, 572 km (355 mile) pipeline connects the states of Chihuahua and Sinaloa, supplying numerous communities along the way.
 
* The 30-inch diameter, 572 km (355 mile) pipeline connects the states of Chihuahua and Sinaloa, supplying numerous communities along the way.
 
* Topolobampo Gas Pipeline interconnects with [[Mazatlan Gas Pipeline]]
 
* Topolobampo Gas Pipeline interconnects with [[Mazatlan Gas Pipeline]]
  
  
+++ History
+
=== History ===
 
* 2012 - TransCanada was been awarded the contract to build, own and operate the Pipeline by the Comisión Federal de Electricidad (CFE)  
 
* 2012 - TransCanada was been awarded the contract to build, own and operate the Pipeline by the Comisión Federal de Electricidad (CFE)  
 
* 2018 - The pipeline entered service
 
* 2018 - The pipeline entered service
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ Links
+
=== Links ===
 
# [http://killajoules.wikidot.com/blog:3347 TransCanada Awarded Contract to Build US$1 Billion Natural Gas Pipeline in Mexico]
 
# [http://killajoules.wikidot.com/blog:3347 TransCanada Awarded Contract to Build US$1 Billion Natural Gas Pipeline in Mexico]
 
# [https://abarrelfull.blogspot.com/2023/04/transcanada-places-topolobampo-pipeline.html TransCanada Places Topolobampo Pipeline Into Service]
 
# [https://abarrelfull.blogspot.com/2023/04/transcanada-places-topolobampo-pipeline.html TransCanada Places Topolobampo Pipeline Into Service]

Latest revision as of 07:06, 20 September 2023

Summary Information

  • Source: El Encino, in the state of Chihuahua
  • Destination: Topolobampo, in the state of Sinaloa
  • Ownership: TransCanada
  • Website: http://www.transcanada.com/
  • Length: 530 kilometres (329 miles)
  • Capacity: 670 million cubic feet per day
  • Status: In operation

Details

  • The 30-inch diameter, 572 km (355 mile) pipeline connects the states of Chihuahua and Sinaloa, supplying numerous communities along the way.
  • Topolobampo Gas Pipeline interconnects with Mazatlan Gas Pipeline


History

  • 2012 - TransCanada was been awarded the contract to build, own and operate the Pipeline by the Comisión Federal de Electricidad (CFE)
  • 2018 - The pipeline entered service