Summary Information

  • Source: El Oro
  • Destination: Mazatlan, in the state of Sinaloa
  • Ownership: TC Energy
  • Website: https://www.tcenergy.com/
  • Length: 413 kilometres (257 miles)
  • Capacity: per day
  • Status: Planned

+++ Details

  • The 24-inch diameter pipeline will be approximately 413 kilometres (257 miles) long and have contracted capacity of 202 million cubic feet a day. The pipeline is expected to be in service in the fourth quarter of 2016. It will interconnect with the El Encino-to-Topolobampo Pipeline (Topolobampo Pipeline)

+++ History

  • 2012 - TransCanada was been awarded the contract to build, own and operate the Pipeline by the Comisión Federal de Electricidad (CFE)

+++ Other Information

  • -

+++ Links

  1. TransCanada Wins Additional US$400-Million Contract to Build New Natural Gas Pipeline Infrastructure in Mexico