Difference between revisions of "Surmont Oil Sands Project"

From A Barrel Full
Jump to navigation Jump to search
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Conoco  
 
* Operator: Conoco  
 
* Country: Canada  
 
* Country: Canada  
Line 5: Line 5:
 
* Production start:  
 
* Production start:  
 
* Partners: Conoco - 50%, Total - 50%
 
* Partners: Conoco - 50%, Total - 50%
* Type: Oil / Gas
+
* Type: Oil
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume: 26,000
 
* Production Volume: 26,000
  
+++ Description
+
=== Description ===
 
* A Steam Assisted Gravity Drainage project
 
* A Steam Assisted Gravity Drainage project
  
+++ Contractors
+
=== Contractors ===
 
++++ Surmont Phase 2
 
++++ Surmont Phase 2
 
* **Bantrel:**
 
* **Bantrel:**
Line 23: Line 23:
  
  
+++ History
+
=== History ===
 
* 1997 - The initial Surmont pilot project began
 
* 1997 - The initial Surmont pilot project began
 
* 2003 - The joint venture decided to launch the first phase of commercial development
 
* 2003 - The joint venture decided to launch the first phase of commercial development
Line 32: Line 32:
 
* 2023 - Suncor acquired Total's stake
 
* 2023 - Suncor acquired Total's stake
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[Aker Solutions Oil And Gas Processing References]]
 
# [[Aker Solutions Oil And Gas Processing References]]
 
# [http://killajoules.wikidot.com/archive:imv-projects-awarded-surmont-development-study-by-co IMV Projects Awarded Surmont Development Study by ConocoPhillips Canada]
 
# [http://killajoules.wikidot.com/archive:imv-projects-awarded-surmont-development-study-by-co IMV Projects Awarded Surmont Development Study by ConocoPhillips Canada]

Revision as of 14:47, 27 April 2023

Summary Information

  • Operator: Conoco
  • Country: Canada
  • Location: 60 kilometers southeast of Fort McMurray in Alberta
  • Production start:
  • Partners: Conoco - 50%, Total - 50%
  • Type: Oil
  • Estimated Reserves:
  • Production Volume: 26,000

Description

  • A Steam Assisted Gravity Drainage project

Contractors

++++ Surmont Phase 2

  • **Bantrel:**
    • Front-end engineering activities (FEL-3)
    • Engineering Procurement & Construction
  • **Aker Solutions:**
    • Slop Oil Treater Package
    • 2 FWKO Vessels c/w insulation; platform; sample box; sample tubing & sample cooler - 13 ID x 60
    • 2 Treater Vessels c/w insulation; platform; sample tubing; sample cooler & sample box 13 ID x 80


History

  • 1997 - The initial Surmont pilot project began
  • 2003 - The joint venture decided to launch the first phase of commercial development
  • 2005 - Total increased its stake to 50%
  • 2007 - Surmont Project Enters Commercial Production
  • 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2
  • 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2
  • 2023 - Suncor acquired Total's stake

Geology

Links

  1. Aker Solutions Oil And Gas Processing References
  2. IMV Projects Awarded Surmont Development Study by ConocoPhillips Canada
  3. Canada : Total increases its share in the Surmont oil sands leases to 50 %
  4. Surmont Project Enters Commercial Production
  5. ConocoPhillips Surmont Phase 2 Project, Bantrell
  6. Suncor Energy to Acquire TotalEnergies' Canadian Operations for $5.5 Billion, Plus Additional Potential Payments up to an Aggregate Maximum of $600 Million