Surmont Oil Sands Project
Jump to navigation
Jump to search
Summary Information
- Operator: Conoco
- Country: Canada
- Location: 60 kilometers southeast of Fort McMurray in Alberta
- Production start:
- Partners: Conoco - 50%, Total - 50%
- Type: Oil
- Estimated Reserves:
- Production Volume: 150,000
Description
- A Steam Assisted Gravity Drainage project
Contractors
++++ Surmont Phase 2
- **Bantrel:**
- Front-end engineering activities (FEL-3)
- Engineering Procurement & Construction
- **Aker Solutions:**
- Slop Oil Treater Package
- 2 FWKO Vessels c/w insulation; platform; sample box; sample tubing & sample cooler - 13 ID x 60
- 2 Treater Vessels c/w insulation; platform; sample tubing; sample cooler & sample box 13 ID x 80
History
- 1997 - The initial Surmont pilot project began
- 2003 - The joint venture decided to launch the first phase of commercial development
- 2005 - Total increased its stake to 50%
- 2007 - Surmont Project Enters Commercial Production
- 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2
- 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2
- 2015 - Surmont 2 started production
- 2023 - Suncor acquired Total's stake
Geology
Links
- Aker Solutions Oil And Gas Processing References
- IMV Projects Awarded Surmont Development Study by ConocoPhillips Canada
- Canada : Total increases its share in the Surmont oil sands leases to 50 %
- Surmont Project Enters Commercial Production
- ConocoPhillips Surmont Phase 2 Project, Bantrell
- Canada: Start-up of Surmont 2
- Suncor Energy to Acquire TotalEnergies' Canadian Operations for $5.5 Billion, Plus Additional Potential Payments up to an Aggregate Maximum of $600 Million