Difference between revisions of "Pegaga Gas Field"

From A Barrel Full
Jump to navigation Jump to search
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
* Operator:  
+
* Operator: Mubadala
* Country:  
+
* Country: Malaysia
* Location:  
+
* Location: Block 320 offshore
* Production start:  
+
* Production start: 2022
* Partners:  
+
* Partners: Mubadala, Petronas, Shell
 
* Type: Oil / Gas
 
* Type: Oil / Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
Line 11: Line 11:
 
=== Description ===
 
=== Description ===
 
* The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.  
 
* The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.  
The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.  
+
* The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.  
The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore [[Malaysia LNG Terminal| Malaysia LNG plant in Bintulu]].
+
* The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore [[Malaysia LNG Terminal| Malaysia LNG plant in Bintulu]].
  
 
=== Contractors ===
 
=== Contractors ===
* -
+
* Sapura Fabrication: Engineering, Procurement, Construction, Installation & Commissioning (EPCIC)
  
 
=== History ===
 
=== History ===

Revision as of 08:25, 22 March 2023

Summary Information

  • Operator: Mubadala
  • Country: Malaysia
  • Location: Block 320 offshore
  • Production start: 2022
  • Partners: Mubadala, Petronas, Shell
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.
  • The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.
  • The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu.

Contractors

  • Sapura Fabrication: Engineering, Procurement, Construction, Installation & Commissioning (EPCIC)

History

  • 2018 - Final investment decision taken

Geology

Links

  1. Pegaga Gas Development in Malaysia Approved