Difference between revisions of "CP2 LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
− | * | + | * A liquefied natural gas (LNG) terminal with a nameplate liquefaction capacity of 20 million metric tonnes per annum (MTPA) of LNG and a peak capacity of approximately 24 MTPA |
=== Technical Details === | === Technical Details === |
Revision as of 15:07, 20 December 2021
Contents
Summary Information
- Ownership: Venture Global
- Website:
- Location:
- Capacity: 20.0 million tons/annum
- Status: Planned
Brief Description
- A liquefied natural gas (LNG) terminal with a nameplate liquefaction capacity of 20 million metric tonnes per annum (MTPA) of LNG and a peak capacity of approximately 24 MTPA
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers: The CP Express pipeline will provide natural gas to the CP2 LNG facility
- Customers:
History
- 2021 - Venture Global announced the project
Other Information
- -