Difference between revisions of "Plock Refinery Bottom of the Barrel Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 17: | Line 17: | ||
** | ** | ||
=== Refining Units === | === Refining Units === | ||
− | * | + | * Solvent deasphalting (SDA) |
+ | * Residue Fluid Catalytic Cracker (RFCC) | ||
+ | |||
=== Terminal Capacity === | === Terminal Capacity === | ||
* Crude Oil: | * Crude Oil: |
Revision as of 17:06, 12 November 2021
Contents
Summary Information
- Ownership:
- Website:
- Wiki Page: Plock Refinery
- Location:
- Capacity: million tons/annum & 00,000 bbl/day
- Nelson Complexity:
- Project Stage:
- Expected Completion: 201X
- Budget:
The Project
- Project Type:
- Project Summary:
- Main Contractors
- Licences
Refining Units
- Solvent deasphalting (SDA)
- Residue Fluid Catalytic Cracker (RFCC)
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
-
History
- 2021 - KBR was awarded licences for the Bottom of the Barrel project
Other Information
-