Difference between revisions of "Sur de Texas – Tuxpan Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 6: | Line 6: | ||
* Website: https://www.tcenergy.com/ | * Website: https://www.tcenergy.com/ | ||
* Length: 770 kilometres (478 miles) | * Length: 770 kilometres (478 miles) | ||
| − | * Capacity: per day | + | * Capacity: 2.6 bcf per day |
| − | * Status: | + | * Status: Operating |
=== Details === | === Details === | ||
| − | * Running almost entirely under the Gulf of Mexico, this 800 km (497 mile) long pipeline | + | * Running almost entirely under the Gulf of Mexico, this 800 km (497 mile) long pipeline delivers natural gas from the USA to state of Veracruz. |
=== History === | === History === | ||
* 2016 - Transcanada JV chosen to build the pipeline | * 2016 - Transcanada JV chosen to build the pipeline | ||
* 2017 - EPC contract awarded | * 2017 - EPC contract awarded | ||
| + | * 2019 - Pipeline started operations | ||
=== Other Information === | === Other Information === | ||
Revision as of 15:13, 9 January 2024
Summary Information
- Source: Sur de Texas
- Destination: Tuxpan, Veracruz
- Ownership: TC Energy
- Website: https://www.tcenergy.com/
- Length: 770 kilometres (478 miles)
- Capacity: 2.6 bcf per day
- Status: Operating
Details
- Running almost entirely under the Gulf of Mexico, this 800 km (497 mile) long pipeline delivers natural gas from the USA to state of Veracruz.
History
- 2016 - Transcanada JV chosen to build the pipeline
- 2017 - EPC contract awarded
- 2019 - Pipeline started operations
Other Information
- -