Difference between revisions of "Shin Oak NGL Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 13: Line 13:
 
* The Shin Oak NGL pipeline originates at [[Hobbs NGL Fractionation Center]] in Gaines County, Texas. The 24-inch diameter pipeline has an initial design capacity of 250,000 barrels per day (“BPD”), expandable to 600,000 BPD.
 
* The Shin Oak NGL pipeline originates at [[Hobbs NGL Fractionation Center]] in Gaines County, Texas. The 24-inch diameter pipeline has an initial design capacity of 250,000 barrels per day (“BPD”), expandable to 600,000 BPD.
 
* The pipeline is for NGL's from the Permian basin
 
* The pipeline is for NGL's from the Permian basin
 +
* The Waha lateral connects Waha to Mont Belvieu
 
* An expansion is underway which would add up to 275,000 BPD of capacity, with completion expected in the first half of 2024.
 
* An expansion is underway which would add up to 275,000 BPD of capacity, with completion expected in the first half of 2024.
  
Line 22: Line 23:
 
* 2019 - Pipeline enters operations
 
* 2019 - Pipeline enters operations
 
* 2019 - Altus Midstream acquired a 33% Stake  
 
* 2019 - Altus Midstream acquired a 33% Stake  
 +
* 2019 - 34 mile Waha lateral completed
 
* 2022 - Expansion project launched
 
* 2022 - Expansion project launched
  
Line 29: Line 31:
  
 
=== Links ===
 
=== Links ===
 
+
# [[EIA Liquids Pipeline Projects 2015-2020]]
 
# [https://abarrelfull.blogspot.com/2023/09/enterprise-to-build-shin-oak-ngl.html Enterprise to Build Shin Oak NGL Pipeline from Permian Basin to Mont Belvieu, Texas]
 
# [https://abarrelfull.blogspot.com/2023/09/enterprise-to-build-shin-oak-ngl.html Enterprise to Build Shin Oak NGL Pipeline from Permian Basin to Mont Belvieu, Texas]
 
# [https://abarrelfull.blogspot.com/2023/09/enterprise-begins-service-on-shin-oak.html Enterprise Begins Service on Shin Oak NGL Pipeline]
 
# [https://abarrelfull.blogspot.com/2023/09/enterprise-begins-service-on-shin-oak.html Enterprise Begins Service on Shin Oak NGL Pipeline]

Revision as of 06:40, 28 September 2023

Summary Information

  • Source: Gaines County, Texas
  • Destination: Mont Belvieu, Texas
  • Ownership: Enterprise
  • Website: https://www.enterpriseproducts.com/
  • Length: kilometres (571 miles)
  • Capacity: 250,000 barrels of oil per day
  • Product Type: mixed NGLs

Brief Description

  • The Shin Oak NGL pipeline originates at Hobbs NGL Fractionation Center in Gaines County, Texas. The 24-inch diameter pipeline has an initial design capacity of 250,000 barrels per day (“BPD”), expandable to 600,000 BPD.
  • The pipeline is for NGL's from the Permian basin
  • The Waha lateral connects Waha to Mont Belvieu
  • An expansion is underway which would add up to 275,000 BPD of capacity, with completion expected in the first half of 2024.

Pipeline Status

  • In operation

History

  • 2017 - Final investment decision
  • 2019 - Pipeline enters operations
  • 2019 - Altus Midstream acquired a 33% Stake
  • 2019 - 34 mile Waha lateral completed
  • 2022 - Expansion project launched

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2015-2020
  2. Enterprise to Build Shin Oak NGL Pipeline from Permian Basin to Mont Belvieu, Texas
  3. Enterprise Begins Service on Shin Oak NGL Pipeline
  4. Altus Midstream Acquires Stake in Enterprise’s Shin Oak Pipeline
  5. Enterprise Announces Three Expansions in the Permian Basin