Difference between revisions of "Netra Nogat Pipeline System"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 10: | Line 10: | ||
+++ Details | +++ Details | ||
| − | * A natural gas pipeline system, which connects Dutch continental shelf with an | + | * A natural gas pipeline system, which connects Dutch continental shelf with an [[Den Helder Gas Processing Plants | onshore gas plant and terminal at Den Helder]], the Netherlands. |
| − | * It also transports gas from the Danish section of the North Sea, via the | + | * It also transports gas from the Danish section of the North Sea, via the [[Tyra Oil And Gas Field]] |
+++ Contractors | +++ Contractors | ||
Revision as of 20:44, 4 January 2023
Summary Information
- Source: Offshore Netherlands
- Destination: Den Helder
- Ownership: 45% Energie Beheer Nederland B.V. (EBN), 48.2% GDF Suez, and 1.8% by Venture Production.
- Website: http://www.nogat.nl/
- Length: 264 kilometres ( miles)
- Capacity: 12 billion cubic meters per annum
- Status: Operating
+++ Details
- A natural gas pipeline system, which connects Dutch continental shelf with an onshore gas plant and terminal at Den Helder, the Netherlands.
- It also transports gas from the Danish section of the North Sea, via the Tyra Oil And Gas Field
+++ Contractors
- **McDermott-ETPM:** Pipeline installation
++++ Related Fields
- A12a Gas Fields
- F3-FA Gas Field
- F15a Gas Fields
- L05a Gas Fields
- L8 And L5 Offshore Gas Fields
- L09a and L09b Gas Fields
- M07 Gas Fields
+++ History
- 1992 - Pipeline commissioned
- 2008 - GDF acquires a 30% share in the pipeline from NAM
- 2009 - Venture Production acquires a minor share from Lundin
- 2011 - GDF Suez Becomes Majority Shareholder In NOGAT
+++ Links