Summary Information
- Operator: Wintershall
- Country: Netherlands
- Location: North Sea
- Production start:
- Partners: Dana
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The development consists of a number of platforms
- L8-G, L8-P4 - integrated
- L8-A, L8-H, L8-P - satellite
- L8-A-west - subsea completion
- The L5-B & L5-C platforms are also tied back to the L8-P4
- The L6-B platform is a remote tie-back to L8-P4
- Gas is transported by the Netra Nogat Pipeline System
+++ Contractors
- **KWsubsea:** L5C Field Development Pipeline
- **VBMS:** engineering, installation and burial of L6-B platform umbilical
+++ History
- 1988 - First platforms installed
- 1994 - L8-P platform added
- 2000 - L8-A-west & L8-P4 platforms installed
- 2003 - L5-B satellite platform added
- 2006 - L5-C satellite platform added
- 2010 - Dana Acquire PetroCanada's stake
- 2014 - L6-B platform tie back completed
- 2015 - First production from L6-B
+++ Geology
- The fields are Rotliegendes (dry) gas fields