Summary Information

  • Operator: Wintershall
  • Country: Netherlands
  • Location: North Sea
  • Production start:
  • Partners: Dana
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The development consists of a number of platforms
    • L8-G, L8-P4 - integrated
    • L8-A, L8-H, L8-P - satellite
    • L8-A-west - subsea completion
  • The L5-B & L5-C platforms are also tied back to the L8-P4
  • The L6-B platform is a remote tie-back to L8-P4
  • Gas is transported by the Netra Nogat Pipeline System

+++ Contractors

  • **KWsubsea:** L5C Field Development Pipeline
  • **VBMS:** engineering, installation and burial of L6-B platform umbilical

+++ History

  • 1988 - First platforms installed
  • 1994 - L8-P platform added
  • 2000 - L8-A-west & L8-P4 platforms installed
  • 2003 - L5-B satellite platform added
  • 2006 - L5-C satellite platform added
  • 2010 - Dana Acquire PetroCanada's stake
  • 2014 - L6-B platform tie back completed
  • 2015 - First production from L6-B

+++ Geology

  • The fields are Rotliegendes (dry) gas fields

+++ Links

  1. Platforms Netherlands Continental Shelf
  2. KWsubsea Upheaval Buckling And Out Of Straightness Analysis
  3. Acquisition Of Petro Canada Netherlands B.V.
  4. VBMS successfully completes umbilical installation