Difference between revisions of "A and B Blocks Gas Fields Development"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Chevron * Country: Netherlands * Location: upper northern part of the Dutch Continental Shelf * Production start: 2008 * Partners: * Type: O...") |
Abarrelfull (talk | contribs) |
||
| Line 11: | Line 11: | ||
+++ Description | +++ Description | ||
* Blocks A&B include two exploration licences (B10a/A12b and B16a) and five production licences (A12a, A12d, A18a, A18c and B13a/B10c.) located in the upper northern part of the Dutch Continental Shelf | * Blocks A&B include two exploration licences (B10a/A12b and B16a) and five production licences (A12a, A12d, A18a, A18c and B13a/B10c.) located in the upper northern part of the Dutch Continental Shelf | ||
| − | * The development consists of a Central Processing Platform in | + | * The development consists of a Central Processing Platform in [[A12a Gas Fields | Block A12a]] with a natural gas transportation pipeline connecting to the A6-F3 Gas Transportation Pipeline for further transportation to shore |
* The A12 central processing platform has a design processing capacity of 3.35 million m3/day (125 MMSCF/day) | * The A12 central processing platform has a design processing capacity of 3.35 million m3/day (125 MMSCF/day) | ||
Revision as of 12:53, 27 October 2023
Summary Information
- Operator: Chevron
- Country: Netherlands
- Location: upper northern part of the Dutch Continental Shelf
- Production start: 2008
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Blocks A&B include two exploration licences (B10a/A12b and B16a) and five production licences (A12a, A12d, A18a, A18c and B13a/B10c.) located in the upper northern part of the Dutch Continental Shelf
- The development consists of a Central Processing Platform in Block A12a with a natural gas transportation pipeline connecting to the A6-F3 Gas Transportation Pipeline for further transportation to shore
- The A12 central processing platform has a design processing capacity of 3.35 million m3/day (125 MMSCF/day)
+++ Contractors
- **Heerema Marine Contractors:** Central Processing Platform
- **HSM Offshore:** B13 Satellite Platform, Jacket & Living Quarters
- **Seaway Heavy Lifting:** B13 Satellite Platform installation
+++ History
- 2004 - Dynas & Unocal acquired NAMs stake
- 2006 - Agreements of Cooperation signed for the development of the A&B Blocks
- 2008 - First gas produced
+++ Geology
+++ Links
- Platforms Netherlands Continental Shelf
- FoundOcean Subsea References
- Seaway Heavy Lifting Oil And Gas References
- HSM Offshore Platform References
- Dyas negotiates deal with NAM to acquire A&B block shallow gas reservoirs
- Chevron development unlocks gas potential in the Netherlands
- First Gas Achieved From A12 Shallow Gas Development on Netherlands Continental Shelf