Difference between revisions of "Sangachal Oil and Gas Processing Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Ownership: BP * Website: * Location: * Capacity: * Crude Type: +++ Brief Description * Located 55km south of Baku, the Sangachal Terminal is a vita...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Ownership: BP
 
* Ownership: BP
Line 7: Line 7:
 
* Crude Type:  
 
* Crude Type:  
  
+++ Brief Description
+
=== Brief Description ===
 
* Located 55km south of Baku, the Sangachal Terminal is a vital link in Azerbaijan’s oil and gas industry.
 
* Located 55km south of Baku, the Sangachal Terminal is a vital link in Azerbaijan’s oil and gas industry.
 
* Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals
 
* Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals
Line 13: Line 13:
 
* The terminal is the starting point of the [[[Baku Tbilisi Ceyhan Pipeline]]] and the [[[South Caucasus Gas Pipeline]]]
 
* The terminal is the starting point of the [[[Baku Tbilisi Ceyhan Pipeline]]] and the [[[South Caucasus Gas Pipeline]]]
  
+++ Contractors
+
=== Contractors ===
 
* **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity
 
* **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity
 
* **Aker Solutions:**  
 
* **Aker Solutions:**  
Line 22: Line 22:
 
  * Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers
 
  * Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers
  
+++ Ongoing Projects
+
=== Ongoing Projects ===
 
* -
 
* -
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ History
+
=== History ===
 
* 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2
 
* 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2
  
+++ Relevant Links
+
===  Links ===
# [[[Aker Solutions Oil And Gas Processing References]]]
+
# [[Aker Solutions Oil And Gas Processing References]]
 
# [http://www.bp.com/sectiongenericarticle.do?categoryId=9006674&contentId=7015100 BP, Sangachal Oil Terminal]
 
# [http://www.bp.com/sectiongenericarticle.do?categoryId=9006674&contentId=7015100 BP, Sangachal Oil Terminal]
 
# [http://killajoules.wikidot.com/blog:4857 KBR Awarded Major Engineering Design Contract by BP for Shah Deniz Stage 2 Project]
 
# [http://killajoules.wikidot.com/blog:4857 KBR Awarded Major Engineering Design Contract by BP for Shah Deniz Stage 2 Project]

Revision as of 16:40, 29 October 2022

Summary Information

  • Ownership: BP
  • Website:
  • Location:
  • Capacity:
  • Crude Type:

Brief Description

  • Located 55km south of Baku, the Sangachal Terminal is a vital link in Azerbaijan’s oil and gas industry.
  • Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals
  • The terminal is fed by [[[Shah Deniz Gas Field]]] and [[[Azeri Chirag Guneshli Oil Field]]]
  • The terminal is the starting point of the [[[Baku Tbilisi Ceyhan Pipeline]]] and the [[[South Caucasus Gas Pipeline]]]

Contractors

  • **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity
  • **Aker Solutions:**
* Heater Treater Upgrade
* Engineering and subcontract fabrication of an H2S Scavenging vessel
* 1 Treater Vessel c/w 2 37.5 Kva transformers, two firetubes and 5 desand stations
* Fabrication of one (1) 12' x 60'-0" s/s (145,000 BOPD) multi-phase Separator and four (4) 12" x 50'-0" s/s (32,280 BOPD each) multi-stage Heater Treaters for crude oil dehydration
* Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers

Ongoing Projects

  • -

Other Information

  • -

History

  • 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2

Links

  1. Aker Solutions Oil And Gas Processing References
  2. BP, Sangachal Oil Terminal
  3. KBR Awarded Major Engineering Design Contract by BP for Shah Deniz Stage 2 Project